Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including, but not limited to,permitting, <br /> access agreements,and notification to required contacts(e.g.site managers, inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of <br /> each workday. Sae Perfornmnaance Sel Assessment(SPSA)procedures must be used throughout the project, Weather conditions(heat,cold,rain, lightning)must also be considered. <br /> •Keep work area orderly. <br /> •Decontaminate all equipment going into well. <br /> •Any generators must beequipped with GFCI circuit. <br /> Gauge water levels and Steel toed and shank shoes,hard hat,safety Back strain,inhalation or dermal 0 Have full face respirator with organic cartridges within 3-5 feet of working <br /> product thickness(where glasses with side shields,hearing protection, exposure to chemical hazards, location for quick access. <br /> applicable)in wells. reflective safety vest,chemical resistant repetitive motion. <br /> gloves and apron. •Conduct air quality monitoring in accordance with Attachment 6. <br /> •Maintain safe distance from well head. <br /> •Bend at knees,not at the waist. <br /> Purge well(s)and collect Steel toed and shank shoes,hard hat,safety Cross-contamination. Back •Decontaminate purging equipment between each sampling location. Purge <br /> purge water. glasses with side shields,hearing protection, strain,inhalation or dermal water is not anticipated. <br /> reflective safety vest,leather gloves for the exposure to chemical hazards, <br /> non-chemical aspects of work. slip and fall. Spilling •Use proper lifting techniques. <br /> N you suspect that equipment is contaminated water. •Use PPE and monitoring in accordance with Attachment 6. <br /> contaminated wear chemical resistant <br /> gloves. •Keep work area clear of tripping or slipping hazards. S <br /> •tore puW water in appropriate containers. <br /> Collect groundwater samples Steel toed and shank shoes,hard hat,safety Cross-contamination.Back •Decontaminate sampling equipment between each well(unless disposable). <br /> in accordance with sampling glasses with side shields,hearing protection, strain,inhalation or dermal <br /> plan, reflective safety vest,chemical resistant exposure to chemical hazards, •Use proper lifting techniques. <br /> gloves and apron. slip and fall. Improper labeling 0 Have full face respirator with organic cartridges within 3-5 feet of working <br /> or storage,injury from broken location for quick access. <br /> sample bottle(cuts or acid bum). <br /> •Label samples in accordance with sampling plan. <br /> •Keep samples stored in proper containers,at correct temperature,and away from <br /> work area. Handle bottles carefully. <br /> Dispose or store purge water Steel toed and shank shoes,hard hat,safety Back strain. Exposure to •Use proper equipment to transport water(pumps,drum dollies,etc.). <br /> (if any)onsite. glasses with side shields,hearing protection, contaminants. If disposing <br /> reflective safety vest,chemical resistant through onsite treatment system, •Have full face respirator with organic cartridges within 3-5 feet of working <br /> gloves and apron. damage or injury from improper location for quick access. <br /> use of equipment. Improper <br /> storage or disposal. •Label storage containers properly,and locate in isolated area away from traffic <br /> and other site functions. <br /> •Coordinate offsite dis sal(where applicable). <br /> Clean siteldemobihm. Steel toed and shank shoes,hard hat,safety Traffic. Safety hazard left on •Use buddy system as necessary to remove traffic control.Leave site clean of <br /> glasses with side shields,hearing protection, site. Lifting hazards. refuse and debris. Clearly mark/barricade any borings that need later topping . <br /> reflective safety vest,leather gloves for the off or curing.Notify site personnel of departure,final well locations and any <br /> non-chemical aspects of work. cuttin s/ ur a water left onsite.Use proper lifting techniques ' <br /> Package and deliver samples Bottle breakage,back strain. •Handle and pack bottle carefully(bubble wrap bags are helpful). Use proper <br /> to lab. <br /> SECOR International Incorporated 16 Generic HASP <br />