Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to,permitting,
<br /> access agreements,and notification to required contacts(e.g.site managers,inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of
<br /> each workday, Sae Pe ormance Sel Assessment(SPSA)procedures must be used throughout the project, Weather conditions(heat,cold, rain, lightning)must also be considered.
<br /> •Complete the Pre-Drilling section of the Borehole Clearance Review form.
<br /> Commence hand angering or Steel toed and shank shoes,hard hat,safety Back strain,underground •Avoid twisting back during the operation;Decontaminate equipment after use.
<br /> post-hole digging to 5' glasses with side shields,hearing protection, utilities. Equipment will be decontaminated by scrubbing with Alconox and water and
<br /> reflective safety vest,leather gloves for the triple rinsing with distilled water. Decon water will be collected in a bucket for
<br /> non-chemical aspects of work. disposal.
<br /> If you suspect that equipment is
<br /> contaminated,wear chemical resistant gloves
<br /> during decontamination of equipment. — —
<br /> Commence direct-push Steel toed and shank shoes,hard hat,safety Cross-contamination from •Decontaminate sampling after collecting a sample and decontaminate drilling
<br /> drilling. glasses with side shields,hearing protection, previous hole.Back strain,heat equipment after each borehole.
<br /> reflective safety vest,leather gloves for the or cold,eye injury,noise, •
<br /> non-chemical aspects of work. exposure to chemical hazards, •Use proper lifting techniques.Monitor air quality in accordance with
<br /> hitting an underground utility, Attachment 6. Monitor drilling progress. Keep work area clear of tripping or
<br /> trip and fall,equipment failure slipping hazards.Perform periodic visual inspections of drill rig.
<br /> Collect samples in Wear full face respirator with organic Cross-contamination,improper •Evaluate any soil samples inside a Ziploc bag at arm's length. DO NOT
<br /> accordance with sampling cartridges if needed.Steel toed and shank labeling or storage,exposure to EVALUATE THE SAMPLE IN THE OPEN. THIS WILL AVOID
<br /> plan, shoes,hard hat,safety glasses with side site contaminants. UNNECESSARY EXPOSURE.
<br /> shields,hearing protection,reflective safety
<br /> vest,chemical resistant gloves. •Decontaminate sampling equipment between each sampling ran. Label samples
<br /> in accordance with sampling plan.
<br /> •Keep samples stored in proper containers,at correct temperature,and away from
<br /> work area.
<br /> •Perform air monitoring as outlined in Attachment 6.
<br /> Store cuttings(if any) Steel toed and shank shoes,hard hat,safety Exposure to public. Traffic •Have proper storage containment and labeling available onsite. Place materials
<br /> properly in accordance with glasses with side shields,hearing protection, hazard or in isolated location away from traffic and other site functions.(See next section
<br /> site-specific requirements. reflective safety vest,leather gloves for the obstruction/inconvenience to for Waste Description. Indicate specifically what disposal you have planned
<br /> non-chemical aspects of work. station operation. Improper Who will pick it up,where will it go for disposal. Be specific.)
<br /> If you suspect that equipment is storage or disposal.
<br /> contaminated,wear chemical resistant
<br /> gloves.
<br /> Backfill borehole. Steel toed and shank shoes,hard hat,safety Improper grouting can lead to •Mix grout to specification and completely fill the hole.
<br /> glasses with side shields,hearing protection, future vertical conduit for
<br /> reflective safety vest,leather gloves for the contaminant migration. Back •Use proper lifting techniques.
<br /> non-chemical aspects of work. strain,trip hazards,eye injury
<br /> from splashing or release of •Keep work area clear of tripping hazards.
<br /> pressurized grout. Unauthorized •Verify presence or other authorization by required inspectors for grouting.
<br /> backfilling causes extra work.
<br /> Develop well Steel toed and shank shoes,hard hat safety Physical injury from mechanical 0 Make sure equipment is in good working order and pressurized hoses are whip-
<br /> glasses with side shields,hearing protection, failure or drill rig or air checked.
<br /> reflective safety vest,chemical resistant compressor. Trip hazard.
<br /> gloves and apron. Exposure to contaminants. •Have full face respirator with organic cartridges within 3-5 feet of working
<br /> Cross-contamination. Electric location for quick access.
<br /> shock.
<br /> SECOR International Incorporated 15 Generic HASP