My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SOIL MANAGEMENT PLAN AND EXCAVATION WORK PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0537774
>
ARCHIVED REPORTS_SOIL MANAGEMENT PLAN AND EXCAVATION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:59:37 PM
Creation date
1/29/2020 4:44:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SOIL MANAGEMENT PLAN AND EXCAVATION WORK PLAN
RECORD_ID
PR0537774
PE
2950
FACILITY_ID
FA0021779
FACILITY_NAME
FED X GROUND TRACY PROJECT
STREET_NUMBER
24550
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
24550 S HANSEN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.5 EXCAVATION BACKFILLING <br /> Soil deemed acceptable for re-use as described above will be intermixed with imported <br /> fill to create an engineered backfill. The backfill material will be placed in maximum 1- <br /> foot lifts,moisture conditioned as needed,and compacted in place to a minimum of 90% <br /> relative compaction(ASTM D1557),up to a depth of approximately 2 feet below original <br /> grade. The upper 2 feet will be compacted to a minimum of 95% relative compaction. <br /> The engineered backfill will continue until a depth of approximately 6- to 8-inches <br /> below grade (depending on original topsoil thickness). The previously stripped off <br /> topsoil layer (with seed bank) will be placed, moisture conditioned, and compacted as a <br /> final lift in the backfilled excavation. <br /> Compaction testing will be performed utilizing a nuclear densometer with the number <br /> of tests determined by the area of backfilling (a minimum of 1 test per 250 square feet of <br /> backfill area for every 1-foot lift. <br /> 3.6 REPORTING <br /> Following receipt and verification of all analytical data,manifests,etc.,CRA will prepare <br /> a report documenting field activities, analytical results, conclusions, and <br /> recommendations. The report will include permits, figures, data tables, and certified <br /> laboratory analytical data sheets. <br /> 3.7 SCHEDULE <br /> A conceptual implementation schedule is provided below. <br /> • Receive RWQCB approval of well destruction work plan-May 30,2014 <br /> o This work plan was submitted under separate cover on May 23,2014 <br /> • Complete well destructions-June 6,2014 <br /> • Receive RWQCB approval of excavation work plan-June 13,2014 <br /> • Retain excavation contractor-June 27,2014 <br /> 080223(33) 10 CONESTOGA-ROVERS&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.