My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0537774
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:57:05 PM
Creation date
1/29/2020 4:45:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537774
PE
2950
FACILITY_ID
FA0021779
FACILITY_NAME
FED X GROUND TRACY PROJECT
STREET_NUMBER
24550
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
24550 S HANSEN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` • . 4Pu YF9 • <br /> I <br /> e I� <br /> Ms. Ellsaesser Page 2 <br /> San Joaquin County EHD <br /> May 20,2013 Project Number 33113-013018.02 <br /> encountered first). Three of the borings will be for grab groundwater sampling, only. Up to one <br /> soil sample will generally be collected at the remaining boring locations, except for borings along <br /> the former Shell pipeline area where up to 2 soil samples will be collected for analysis. <br /> • Up to seven soil vapor borings will be advanced to 5 feet bgs in proposed structure locations. <br /> Direct-push drilling equipment will be used to advance the soil borings. Standard soil logging and sample <br /> handling practices will be employed. The soil, soil vapor and grab groundwater samples will be collected <br /> from the borings and preserved using standard techniques. <br /> The borings will be grouted using a tremmie pipe in accordance with SJCEHD guidelines. Soil cuttings <br /> and decontamination rinsate generated during drilling activities will be placed into appropriate, sealed and <br /> labeled 55-gallon drums. Samples of the investigation-derived wastes will be collected and submitted to <br /> an analytical laboratory for waste characterization analyses. Following waste acceptance profiling, the <br /> drums will be picked-up and disposed at an appropriate, offsite waste disposal facility. <br /> Laboratory Analysis: Up to 16 groundwater samples, 30 soil samples and seven soil vapor samples will <br /> be submitted to analytical laboratories for analysis of one or more of the following analyses by standard <br /> United States Environmental Protection Agency(USEPA) methods. <br /> • Total Petroleum Hydrocarbons(TPH) as gasoline-range organics(TPH-g), diesel-range organics <br /> (TPH-d)and motor oil-range organics(TPH-mo)by USEPA Method 8015B with silica gel cleanup <br /> —Up to 30 soil samples(up to 12 shallow composite samples and 18 discrete samples) <br /> • Benzene, Toluene, Ethyl benzene and Xylenes (BTEX) and MTBE by USEPA Method 82608- <br /> Up to 30 soil samples (up to 12 shallow composite samples and 18 discrete samples) <br /> • Organochlorine Pesticides(OCPs) by USEPA Method 8081 —Up to 18 soil samples (including 12 <br /> composite samples and 6 discrete samples) <br /> • Resource Conservation Recovery Act(RCRA) 8 Metals by USEPA Method 6010—Up to 18 soil <br /> samples (up to 12 shallow composite samples and 6 discrete samples) <br /> • Volatile Organic Compounds(VOCs) and TPH-g by USEPA Method 82608—Up to 16 grab- <br /> groundwater samples <br /> • TPH-d and TPH-mo by 8015M with silica gel cleanup—Up to 16 grab-groundwater samples <br /> • VOCs by TO-15- Up to 7 soil vapor samples <br /> Reporting: Upon completion of the field activities and receipt of the laboratory analyses, BVNA will <br /> review our findings and analytical results and prepare a written report summarizing the work performed at <br /> the Site. The report will include tabulated data summaries, figures showing the boring locations and <br /> appended boring logs and certified analytical reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.