My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0537774
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:57:05 PM
Creation date
1/29/2020 4:45:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537774
PE
2950
FACILITY_ID
FA0021779
FACILITY_NAME
FED X GROUND TRACY PROJECT
STREET_NUMBER
24550
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
24550 S HANSEN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Jerry Swart Page 3 <br /> FedEx Ground <br /> April 3, 2013 Proposal Number 3303.13.159 <br /> The above fee(as well as our target schedules)assumes the following: (1) FedEx Ground will provide <br /> access to the Site, as necessary; (2)the SJCEHD will approve the submitted Work Plan and issue <br /> associated drilling permits; (3) Field work(i.e., utility clearance,drilling and sample collection)can be <br /> completed within five standard work days;(4) Site conditions(i.e.,drillable geology and topography)allow <br /> for completion of the fieldwork; (5) a concrete corer is not required to advance the borings;and, (6)drilling <br /> can be completed using normal truck-mounted equipment. <br /> This proposal does not include waste disposal costs(e.g., decontamination residue, soil cuttings). BVNA <br /> can assist with removal of waste materials(if generated),if requested. BVNA will not exceed the fixed fee <br /> project amount without prior authorization from FedEx Ground. <br /> BVNA will not be responsible for damage to subsurface utilities that are not identified by the property <br /> owner or its representative,marked by USA-affiliated agencies or public companies, and/or marked by <br /> BVNA's utility locating subcontractor. BVNA will not be responsible for standby time incurred,such as <br /> that which could result from our inability to gain access to the Site. Should you cancel this project at any <br /> time, FedEx Ground will be billed for the services already performed up through the date of cancellation. <br /> This proposal is valid for 30 days. <br /> CLOSING <br /> BVNA appreciates the opportunity to submit this proposal and looks forward to working with you on this <br /> project. If you have any questions or comments regardingis proposal, please contact us <br /> Sincerely, <br /> Jeremy V. Wilson, C.S.S.T., R.E.P.A. Jon .R so, P.E. <br /> Environmental Consultant II Vic sident Key Accounts/International Services <br /> Health, Safety and Environmental Services Health, Safety and Environmental Services <br /> 925.498.6518 925.426.2676 <br /> ieremy.vdlsonfaus.bureauveritas.com ion.rossold.us.bureauveritas.com <br /> Enclosure:Attachment 1 —Site Plan <br /> Bureau Veritas Proposal No.: 3303.13.159 <br /> Proposal Accepted By: <br /> By: <br /> Print Name: <br /> Title: <br />
The URL can be used to link to this page
Your browser does not support the video tag.