Laserfiche WebLink
Phase I Site Assessment Workplan <br /> 200 West Hatding!Way,Stockion,CA <br /> Project No. 150052.01 <br /> Page 2 <br /> In addition,.two samples collected near the former lubrication garage will be analyzed for total <br /> oil and-grease by DHS method 5520 D&E. <br /> To avoid cross contamination, all drilling,and sampling equipment in contact with soils will be <br /> decontaminated between uses. Borings will be-Abandoned by filling with a cement grout through <br /> the augers. <br /> All field work will'be performed.in accordance with the Site Safety Plan included as Attachment <br /> 1. It is estimated that groundwater exists at approximately 50 feet below grade. Groundwater <br /> quality will not be addressed in this assessment. <br /> RESNA has enclosed a completed drilling permit application-and.associated fee of$89.00. Also <br /> r Information Form co feted b W.T. Hull and Co., and <br /> enclosed is a Masterfile Reco d a p Y Inc.,. <br /> associated fee of $234.00 <br /> Drilling activities are scheduled to begin on October 12, 1993. The expedited schedule is <br /> necessary to meet escrow requirements. <br /> If you have any questions or require additional information, please call John Lane at our Escalon <br /> office (209) 838-3507. <br /> Respectfully, <br /> RESNA Industries, Inc. <br /> hn P. Lane <br /> ro}ect Geologist <br /> Gregory P. Stahl <br /> CA.Registered Geologist No. 5023 <br /> JPL/ggk <br /> Enclosures <br />' pc:. Mr. Terry Hull, W.T. Hull and Co., Inc. <br /> WP-1093JWL <br /> 4 <br /> i <br />