My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:21:17 AM
Creation date
1/30/2020 8:30:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 0 9 3 0 MAGNOLIA ENERGY &4,VEF I N I NG <br /> 004 P02 <br /> MAGNOLIA ENERGY AND REFINING CORPORATION <br /> Masnol la <br /> -Fncro,and <br /> ,40)r,i (%^)rp '. <br /> Telic Engineering April 10, 1990 <br /> March Ave. , Suite <br /> Stockton, CA. <br /> Attn . Mr. Mark Roser <br /> Re : Gasoline Contaminated Soil Remediation <br /> Southwest Corner of Pacific Ave. and Hammer Lane <br /> Dear Mr. Roser; <br /> In accordance with your requeQt, Magnolia -F:•-;1ronmental <br /> Services is pleased to submit this proposal to ;jertorm soil <br /> remediation services in Stockton, Californifor Telic <br /> Engineering. „ <br /> POSE <br /> The purpose of the work task is to lowe>: existing total <br /> Petroleum hydrocarbon (TPH) lev :ls associated with <br /> approximately 3, 500 cubic yards c," gae,iline contaminated <br /> sbil to a "treated" level not to <br /> (ppm) . - .seed fj' parts per million <br /> UJHaDOLOGY <br /> Magnolia will supply labor, supplies, and equipment <br /> necQseary to perform a "Ph7w- I " trial run to determine if <br /> the proposed treatment syr, ,cem will achieve a production <br /> volume and asaooia ted TPH r.'eduction which merits proceeding <br /> to Phage II (addition ;-f carbon canisters) . Phase I <br /> equipment will conglat cf an auger feed system and bag <br /> house. Tn accordance our understanding of your <br /> interpretation of applj ,zable air quality permit conditions, <br /> a maximum of 150 cubic yards of contaminated material can <br /> be processed per day using the Phase I system (no carbon) . <br /> SAMPLING <br /> Phase I -- If production volume capability indicates Magnolia <br /> can produce in OXC09e of 150 cubic yards per day of <br /> "treated" soil, Magnolia will, at Magnolia's expense, <br /> provide ono ( 1 ) laboratory analysis performed by a certified <br /> laboratory attendant to Phase I treated soil to determine if <br /> Phaco I "treatment" has achieved desirable results (TPH = or <br /> < S -Ppm) . <br /> i <br /> DALLAS OFFICE BAKERSFIELD OFFICE <br /> 4444 WESTGROVE#320 3302 GULF <br /> DALLAS, TEXAS 75248 BAKF,RSFIELD,CA 93308 <br /> TEL.:(214)248-3081 TEL: (805)323-7781 <br /> FAX:(214)248-7(187 FAX(805)323-0930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.