Laserfiche WebLink
v _ <br /> _ <br /> -- F.:, f <br /> J �+� t lsORM� <br /> EPA 1 N 27 PFS #: 18 Pete Wilson <br /> Governor <br /> State Water January 16, 1998 <br /> Resources <br /> Control Board <br /> Division of Ted& Dena Knowles <br /> Clean Water 1140 Hammer Ln W <br /> Programs Stockton, CA 95209 <br /> Mailing Address <br /> P Bax PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO, 854, <br /> CA <br /> Saccramentoto,,CA <br /> 94244-2120 SITE ADDRESS: 1140 HAMMER LN, STOCKTON, CA 95209 <br /> 2014 T Street, <br /> Suite 130 I have reviewed your request, received on January 15, 1998, for pre-approval of corrective action costs <br /> Sacramento,CA I will place these documents in your file for filture reference I have included a copy of the "Cost pre- <br /> 95814 Approval Request" form Please use this form in the future for requesting pre-approval of corrective <br /> (916)227-6010 <br /> FAX(916)227-4530 action costs <br /> World wide Web <br /> http//www swrcb ca With the following Provisions, the total cost pre-approved for completing four quarters of groundwater <br /> govh-cwphome/ monitoring and sampling by Ground Zero Analysis is$10,577 The pre-approved amount includes <br /> fundhome htm costs for project management, laboratory testing(TPHg/BTEX/Oxygenates), materials, and report <br /> preparation Upon completion of each phase of work,you are required to submit a copy of all technical <br /> reports and any applicable regulatory correspondence to the Fund <br /> Be aware that this pre-approval does not constitute a decision on reimbursement all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved <br /> in this letter 3 <br /> All future costs for corrective action must be approved in writing by Fund staff Future casts for 1 <br /> corrective action must meet the requirements of Article 11, Chapter 16, Underground Storage Tank <br /> Regulations 1\ <br /> 4'F <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to 1 <br /> remain valid `� <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on <br /> the new scope of work <br /> • Although I have referred to the Ground Zero Analysis, Inc proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract the State of California cannot <br /> compel you to sign any specific contract This letter pre-approves the costs as presented in the <br /> • proposal dated January 9, 1998 by Ground Zero Analysis,Inc <br /> Our mission is to preserve and enhance the quality of California s water resources and <br /> Recycled Paper ensure their proper allocation and efficient use for the benefit of preseni and future generations <br />