My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2900 - Site Mitigation Program
>
PR0505722
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:03:05 AM
Creation date
1/30/2020 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505722
PE
2951
FACILITY_ID
FA0006961
FACILITY_NAME
KJAX
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r <br /> Woodward-Clyde <br /> and stored at approximately 4 Celsius. Samples will be delivered tothelaboratory within <br /> 48 hours of collection. Standard sampling procedures are included in Appendix B. <br /> `2.5 INVESTIGATION DERIVED WASTE DISPOSAL <br /> f <br /> Soil cuttings, purged groundwater, and any personal protective equipment used at the site <br /> will be placed in separate 55-gallon drums, and will be segregated by the type of material <br /> to facilitate the disposal process. Each drum will be marked with the source of the material <br /> within it, including dates, boring or well numbers, and the depths from which the material <br /> originated. <br /> The drums will be stored on site pending review of the analytical results for the soil and/or <br /> i <br /> groundwater samples taken at the time that the material was collected. Recommendations <br /> will be developed as to the proper disposal procedure for the material. <br /> t1 2.6 SITE-SPECIFIC HEALTH AND SAFETY PLAN <br /> - Asite-specific health and safety plan will be prepared addressing all field activities to be i <br /> undertaken under this work plan. Included in the health and safety plan will be monitoring <br /> for organic vapors and provisions for drilling operations. The site-specific health and safety <br /> plan will be prepared in accordance with Woodward-Clyde's health and safety manual dated <br /> June 1993 (copies available upon request). All subcontractors working at the site will be • <br /> identified in the plan and will be required to sign a compliance agreement which will become <br /> part of the plan. <br /> i <br /> I <br /> U� ' <br /> 8054WAX2.RPr(03-13}95)SAC 2-3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.