My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2900 - Site Mitigation Program
>
PR0505722
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:03:05 AM
Creation date
1/30/2020 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505722
PE
2951
FACILITY_ID
FA0006961
FACILITY_NAME
KJAX
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Woodward-Clyde <br /> 3.0 <br /> QUALITY ASSURANCE/QUALITY CONTROL (QA/QC) <br /> Field samples will be collected in accordance with the standard field investigation and <br /> sampling procedures included in Appendix B. The following field Quality Control (QC) <br /> L samples will be submitted for laboratory analysis: <br /> L • blind duplicate <br /> • equipment blank <br /> Samples will be transported.to the laboratory within 48 hours of collection by project <br /> personnel. Individual chain-of-custody forms will provide an accurate written record which <br /> can be used to trace the possession and holding of samples from the time of collection <br /> through data analysis and reporting. In addition to the chain-of-custody forms discussed <br /> L above, field logbooks will also be used to document data collection activities. <br /> LThe field and laboratory data collected for the study will be reviewed for precision, 4 <br /> accuracy, and completeness in accordance with the Quality Assurance/Quality Control Plan <br /> L` prepared for the FEMA tank removal activities (see Appendix C) to assure that data of <br /> satisfactory quality are used for interpretation. After validating the data, data summary will <br /> j be prepared. <br /> 8054aaAx3(03-13-95)src 3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.