My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2900 - Site Mitigation Program
>
PR0505722
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:03:05 AM
Creation date
1/30/2020 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505722
PE
2951
FACILITY_ID
FA0006961
FACILITY_NAME
KJAX
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` The wastewater from well purging and free-phase hydrocarbon product will be placed in <br /> 55-gallon drums and stored on site pending analytical results. If needed, Woodward-Clyde will <br /> dispose of the water and the free-phase hydrocarbon product off site. <br /> V <br /> B.3 MONITORING WELL INSTALLATION <br /> �. Some of the soil borings may be completed as groundwater monitoring wells. To complete a <br /> boring as a groundwater monitoring well, the boring will be advanced ten feet beyond the depth <br /> of the groundwater table. Approximately one foot of filter sand will then be placed in the <br /> ►. bottom of the boring. A new 2-inch-diameter Schedule 40 PVC casing will be placed in the <br /> boring. The PVC casing will be equipped with an end cap and the lower twenty feet will be <br /> slotted. Filter sand will be backfilled around the casing to approximately 5 feet above the top <br /> of the screened interval. A three-foot seal of hydrated bentonite pellets will be placed on top <br /> of the filter sand pack. The remainder of the annulus will be backfilled with a cementfbentonite <br /> slurry to approximately two feet below ground surface. Concrete grout will be used to finish <br /> the well and set a wellhead vault with a traffic rated cover. <br /> B.4 EQUIPMENT DECONTAMINATION PROCEDURES <br /> V <br /> Groundwater and soil sampling equipment will be decontaminated between sampling events using <br /> the following procedure: <br /> 1. Wash with Liquinox and water, assisted with brush <br /> 2. Rinse with deionized water, <br /> 3. Second rinse with deionized water <br /> 4. Dry with paper towels or drip dry. <br /> Drill augers and rods will be steam-cleaned prior to drilling each boring. The drill rig will be <br /> steam cleaned prior to initiation of drilling activities. <br /> B.5 SAMPLE LABELING <br /> `' All sample labels will be filled out with indelible ink and uniquely numbered. Soil samples <br /> collected in stainless steel or brass liners will be capped immediately following collection. <br /> Labels may be partially completed prior to sample collection. The date, time, sampler's initials, <br /> ` and the sample identification number should not be completed until the time of sample <br /> collection. At a minimum, each numbered label shall contain the following information: <br /> • Project name <br /> ' Sampler's company affiliation <br /> ,. Date and time of sample collection <br /> �— B-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.