Laserfiche WebLink
Beacon Station No 3641 January 29, 2004 <br /> Stockton, California — T Quarterly Groundwater Monitoring Report <br /> and the fuel oxygenate methyl-t-butyl ether (MTBE) by Environmental Protection Agency <br /> (EPA) Method 8260B <br /> Results of Groundwater Monitoring <br /> Depth-to-groundwater measurements were subtracted from the surveyed TOC elevations to <br /> calculate groundwater elevations Groundwater elevation data, summarized in Table 1, were <br /> used to construct a groundwater contour map (Figure 2) Groundwater level data indicate <br /> flow in the immediate site area was southward under a gradient of approximately 0 002 <br /> Analytical data are summarized in Table 1 Benzene concentration data were used to <br /> construct a benzene isoconcentration map (Figure 3) Analytical reports and the chain-of- <br /> custody document are contained in Attachment C <br /> GeoTracker Electronic Data Deliverables <br /> The analytical electronic data deliverable (EDD) is uploaded by Kiff The groundwater well <br /> measurement file EDD (GEO_WELL) for this quarterly monitoring event has been uploaded <br /> by Horizon The GEO_WELL file upload confirmation sheet is contained in Attachment D <br /> Recommendations <br /> Horizon recommends continued quarterly monitoring during the ongoing investigation and <br /> remediation phases of the project <br /> Horizon performed an additional groundwater investigation in February 2003 The <br /> investigation report was submitted on July 10, 2003 and included recommendations, as <br /> appropriate, for additional fieldwork to delineate the extent of petroleum hydrocarbons in soil <br /> and groundwater Ultramar is in the process of securing right-of-entry agreements with the <br /> off-site property owners to allow installation of additional off-site groundwater monitoring <br /> wells <br /> Horizon is in the process of obtaining a permit from the Stockton Building Department to <br /> install the site interim remediation system The application for electrical and natural gas <br /> utility connections is currently being processed by Pacific Gas and Electric Company After <br /> the building permit is obtained, work will be initiated to install the remediation systems <br /> Distribution <br /> A copy of this report should be forwarded to <br /> Mr Michael Infurna Jr , Senior R E H S Mr Eric Schneider <br /> San Joaquin County Environmental Health Department Auburndale Properties Inc <br /> 304 East Weber Avenue, Third Floor 2951 28th Street, Suite 2050 <br /> Stockton, California 95202-2705 Santa Monica, California 90405 <br /> 641gmrQ403 doc <br /> Project No 1641 46 2 HORIZON ENVIRONMENTAL INC. <br />