My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9504
>
2900 - Site Mitigation Program
>
PR0508462
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 12:22:14 PM
Creation date
1/30/2020 11:02:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508462
PE
2960
FACILITY_ID
FA0008093
FACILITY_NAME
CONTINENTAL GRAIN CO
STREET_NUMBER
9504
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
9504 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ' 1 <br /> MONITORING AND REPORTING PROGRAM ORDER N0. 135-2009-0149-005 -6- <br /> CONTINENTAL <br /> 6- <br /> CONTINENTAL GRAIN COMPANY <br /> SAN JOAQUIN COUNTY <br /> (d) an analysis of whether the pollutant plume is being effectively treated; <br /> (e) a description of all remedial activities conducted during the year, an analysis of their <br /> effectiveness in removing the pollutants, and plans to improve remediation system <br /> effectiveness; <br /> (f) an id entification of any data gaps and potential deficiencies/redundancies in the monitoring <br /> system or reporting program; and <br /> (g) if desired, a proposal and rationale for any revisions to the groundwater sampling plan <br /> frequency and/or list of analytes. <br /> A letter transmitting the monitoring reports shall accompany each report. Such a letter shall <br /> include a discussion of requirement violations found during the reporting period, and actions <br /> taken or planned for correcting noted violations, such as operation or facility modifications. If <br /> the Discharger has previously submitted a report describing corrective actions and/or a time <br /> schedule for implementing the corrective actions, reference to the previous correspondence <br /> will be satisfactory. The transmittal letter shall contain the penalty of perjury statement by the <br /> Discharger, or the Discharger's authorized agent, as described in the Standard Provisions <br /> General Reporting Requirements Section B.3. <br /> The Discharger shall implement the above monitoring program on the first day of the month <br /> following adoption of this Order. <br /> Ordered by: rx- <br /> F'�PAMELA C. CREEDON Executive Officer <br /> (Date) <br /> 05/31/07:AMM <br />
The URL can be used to link to this page
Your browser does not support the video tag.