Laserfiche WebLink
� T <br /> MONITORING AND REPORTING PROGRAM ORDER NO.R5-2009-0149-005 -7- <br /> CONTINENTAL GRAIN COMPANY <br /> SAN JOAQUIN COUNTY <br /> ATTACHMENT A <br /> French Camp Elevator Location of Monitoring Wells, <br /> Injection Wells and Extraction Wells. <br /> CADR E: CG—FRENCH—INJECTION POINTS 0907 <br /> t R6 <br /> i_ <br /> 60, 60 <br /> t FRACTURE BORING & <br /> MONITORING WELL LOCATIONS <br /> FRENCH CAMP ELEVATOR <br /> FRENCH CAMP, CALIFORNIA <br /> ALEGEN <br /> 3 <br /> ,B�MMW <br /> •— PREVIOUS FRACTURE/ <br /> It INJECTION POINT <br /> O— ZONE OF IRON INJECTIONS FOR <br /> B— MONITORING WELL <br /> ®— NEW MONITORING WELL <br /> ■— PROPOSED INJECTION WELL <br /> IW—BH2 .H 2A •— PROPOSED EXTRACTION <br /> IIt p I. WELL <br /> (F <br /> MW 9 <br /> x T <br /> �A 7 11 <br /> N 3.A' S <br /> ..BN t ,+MW- <br /> DH T <br /> In <br /> � W SB BIW—SH <br /> 1 <br /> GATE �j A <br /> X <br /> I� <br /> MW-2 <br /> E <br /> 'M1't X i ��rST <br /> I <br /> ` f x <br /> r 'A 01 <br /> P btN <br /> & <br /> 1A <br />