• • Page 5 <br /> 7. Schedule <br /> Action Date of Completion <br /> 1) Obtain permits for well installation 1)Week of April 14th <br /> 2) Install wells and obtain baseline samples one month 2)Week of April 21st <br /> prior to start-up system(one week) <br /> 3) Develop wells 3)Week of April 28th <br /> 4) Prepare well completion reports 4)Week of May 5th <br /> a/Note that this site is an active grain terminal. Construction activities are limited to the spring months. <br /> 8. Contacts <br /> You may contact any of the following with questions or comments about this project: <br /> Technical Contact <br /> Ms. Linda L. Huff, P.E. Robert Marty <br /> Advanced Geo Environmental, Inc. <br /> President 837 Shaw Road S <br /> Huff&Huff, Inc. Stockton, CA 95215 <br /> 915 Harger Road, Ste. 330 Telephone: 1-209-467-1006 <br /> Oak Brook, IL 60523-1486 <br /> Telephone: (630) 684-9100 <br /> Fax: (630) 684-9120 <br /> Cell Phone: (708) 837-3874 <br /> E-Mail: lhuff@huffnhuff.com <br /> Sincerely, <br /> Linda L. Huff, P.E. <br /> President <br /> cc: James Taylor, ContiGroup Companies, Inc. <br /> Attachments <br /> RACONTGRAMCCACargiIlTrench Camp\GW Recirculation Pilot Study Work Plan October 200TWell Installation Work Plan.Reach Camp Gain <br /> Elevator 0125 OB.doc <br />