Laserfiche WebLink
a <br /> ACTIVITY ALTERNATIVE A 1 Range-Low Range-High <br /> PLANNING AND PREPARATION <br /> Stormwater Permit N/A NIA <br /> Surveying N/A N/A <br /> Workplan $3,500.00 55,000 <br /> INSTALL DEWATERINGfTREATMENT SYSTEM <br /> Discharge fee $3,000.00 $3,500.00 <br /> System design $1,000.00 $2,000.00 <br /> USA-utility locates $300.00 5500.00 <br /> Install piping,instrumentation(flow meter,LEL meter) $7,000.00 $9,000.00 <br /> Dewatering purMsAransfer pumps(set power) 55,000,00 $6,000.00 <br /> Holding tanks $1,500.00 $3,000.00 <br /> Carbon system(based on a 1-month rental fee) $3,500.00 $5,000.00 <br /> Lab analysis for discharge $2,500.00 $3,500.00 <br /> System demob/spent carbon recycling $3,000.00 $5,000.00 <br /> EXCAVATION AND BACKFILLING <br /> Stormwater controls $1,000.00 $2,000.00 <br /> Design shoring Included Below <br /> Remove/dispose concrete slab $1,000.00 $2,000.00 <br /> Destruction of monitoring well $2,000.00 $3,000.00 <br /> Remove power line and power pole 52,000.00 $2,500.00 <br /> Soil waste profile $2,000.00 $2,500.00 <br /> Excavation of soil/backfilling/transportation of impacted soil 591,226.12 $99,519.41 <br /> Disposal of impacted soil $22,965.30 $26,498.42 <br /> Soil sampling/analysis 55,500.00 $8,000.00 <br /> Project oversight $7,000.00 $9,000.00 <br /> Compaction testing 52,500.00 53,500.00 <br /> Replace power pole $2,000.00 $2,500.00 <br /> Shoring/shoring placement 585,000.00 $95,000.00 <br /> TOTAL BUDGET COST ESTIMATE $254,491.42 $298,517.83 <br /> ALTERNATIVE A 1: <br /> R:ICONTGRAN\Stockton\CAP\Cap Addendum Costs&Supporting Calcs <br />