<br /> ACTIVITY ALTERNATIVE A 1 Range-Low Range-High
<br /> PLANNING AND PREPARATION
<br /> Stormwater Permit N/A NIA
<br /> Surveying N/A N/A
<br /> Workplan $3,500.00 55,000
<br /> INSTALL DEWATERINGfTREATMENT SYSTEM
<br /> Discharge fee $3,000.00 $3,500.00
<br /> System design $1,000.00 $2,000.00
<br /> USA-utility locates $300.00 5500.00
<br /> Install piping,instrumentation(flow meter,LEL meter) $7,000.00 $9,000.00
<br /> Dewatering purMsAransfer pumps(set power) 55,000,00 $6,000.00
<br /> Holding tanks $1,500.00 $3,000.00
<br /> Carbon system(based on a 1-month rental fee) $3,500.00 $5,000.00
<br /> Lab analysis for discharge $2,500.00 $3,500.00
<br /> System demob/spent carbon recycling $3,000.00 $5,000.00
<br /> EXCAVATION AND BACKFILLING
<br /> Stormwater controls $1,000.00 $2,000.00
<br /> Design shoring Included Below
<br /> Remove/dispose concrete slab $1,000.00 $2,000.00
<br /> Destruction of monitoring well $2,000.00 $3,000.00
<br /> Remove power line and power pole 52,000.00 $2,500.00
<br /> Soil waste profile $2,000.00 $2,500.00
<br /> Excavation of soil/backfilling/transportation of impacted soil 591,226.12 $99,519.41
<br /> Disposal of impacted soil $22,965.30 $26,498.42
<br /> Soil sampling/analysis 55,500.00 $8,000.00
<br /> Project oversight $7,000.00 $9,000.00
<br /> Compaction testing 52,500.00 53,500.00
<br /> Replace power pole $2,000.00 $2,500.00
<br /> Shoring/shoring placement 585,000.00 $95,000.00
<br /> TOTAL BUDGET COST ESTIMATE $254,491.42 $298,517.83