M. PROJECT SCHEDULE <br /> 11aley & Aldrich, Inc. will mobilize to the site to conduct the site investigation within two <br /> weeks of receiving EHD's approval of this work plan. The site investigation will require <br /> one or two days of field work. Analytical results will be available from the laboratory <br /> approximately two weeks after completion of the field work. The site investigation report <br /> will be delivered to EHD within four weeks of completion of the field work. A tentative <br /> schedule is presented below. This schedule is subject to change due to such matters as the <br /> length of time required by EHD to review this work plan, securing site access, and <br /> availability of the drilling subcontractor among other things. <br /> Proposed Schedule <br /> Stockton Elevator Site Investigation <br /> 1219102 Submit Work Plan <br /> 12/30/02 Work Plan Approved by EHD <br /> 117/03 Begin Field Work <br /> 1/20/03 Analytical Data Available from Laboratory <br /> 1120-2/3/03 Prepare Site Investigation Report <br /> 217/03 Submit Report to EHD <br /> L,`Pi CSTT(ljCCB''COMGroUp-Stockton`Work PLII OC <br />