My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013106
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
ARCHIVED REPORTS_XR0013106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:08:15 PM
Creation date
1/30/2020 11:28:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013106
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. PROJECT SCHEDULE <br /> 11aley & Aldrich, Inc. will mobilize to the site to conduct the site investigation within two <br /> weeks of receiving EHD's approval of this work plan. The site investigation will require <br /> one or two days of field work. Analytical results will be available from the laboratory <br /> approximately two weeks after completion of the field work. The site investigation report <br /> will be delivered to EHD within four weeks of completion of the field work. A tentative <br /> schedule is presented below. This schedule is subject to change due to such matters as the <br /> length of time required by EHD to review this work plan, securing site access, and <br /> availability of the drilling subcontractor among other things. <br /> Proposed Schedule <br /> Stockton Elevator Site Investigation <br /> 1219102 Submit Work Plan <br /> 12/30/02 Work Plan Approved by EHD <br /> 117/03 Begin Field Work <br /> 1/20/03 Analytical Data Available from Laboratory <br /> 1120-2/3/03 Prepare Site Investigation Report <br /> 217/03 Submit Report to EHD <br /> L,`Pi CSTT(ljCCB''COMGroUp-Stockton`Work PLII OC <br />
The URL can be used to link to this page
Your browser does not support the video tag.