Laserfiche WebLink
CONTINENTAL GRAIN CO.—STOCKTON, CA FACILITY <br /> Well Abandonment Project <br /> Huff S Huff February 2425,2010 <br /> 1. k gigi <br /> � S <br /> t s <br /> y` <br /> Photo#1 Pressure grouting MW-1,facing S. Photo#2 Tremie pipe lowered into MW-3 prior to <br /> grouting,after complete overdrillldestruction,facing <br /> NW. <br /> 4�r <br /> a <br /> Photo#3 Tremie pipe grouting MW-4 after complete Photo#4 MW-7 at end of overdrilling,prior to tremie <br /> overdrill/destruction,facing S with MW-7 in foreground pipe sealant pumping,facing SE. <br /> (yet to be drilled out)and MW-3 on left between drums <br /> after sealing. <br /> 'AL <br /> :- , <br /> ■ <br /> P <br /> Photo#5 MW-10 after placement of sealant material, Photo#6 Pressure grouting MW-11 during 25 PSI <br /> removal of inner well cover,prior to cutting off PVC pressurization for 5 min,prior to topping off with <br /> and final sealant placement and cementing flush with sealant,cutting off PVC,removal of inner well cover <br /> surface,facing S. and cementing Flush with surrounding surface- <br />