Laserfiche WebLink
CONTINENTAL GRAIN CO.—STOCKTON, CA FACILITY <br /> Well Abandonment Project <br /> Muff&Huff February 24-25, 2010 <br /> `k I <br /> 1 <br /> L <br /> f� <br /> 4 . <br /> Photo#7 MW-12 after placement of sealant, Photo#8 MW-5 after removal of concrete pad and <br /> pressurization,cutting off PVC,and prior to final coverlbox,prior to grouting via tremie pipe,pressurization, <br /> cementation flush with surrounding surface,facing S. and placement of mushroom cap,facing N. <br /> 1. <br /> Photo#4 MW-6 during pressure grouting,facing N. Photo#10 MW-6 after sealing completed. <br /> Jill"Wilift" J"IIMLAd� aw <br /> Photo#11 Drums on site on 02/25/2010 prior to final Photo#12 Photo of drum area on 0310312010 immediately <br /> disposal event. after drums were picked up for final disposal event.Note area <br /> of former wells MW-7,MW-4,and MW3 on right side of <br /> photo. <br />