Laserfiche WebLink
TIME SCHEDULE <br /> FOR SUBSURFACE INVESTIGATION <br /> at <br /> Inland Paint <br /> 117 West Harding Way <br /> Stockton, Cglifornia <br /> 8/17/98 - 8/21/98 Schedule excavation, transportation, and soil disposal activities with <br /> subcontractors.. <br /> 8/25/98 - 8/26/98 Excavate approximately 70 cubic yards of impacted soil, transport the soil <br /> to Forward Landfill, backfill and resurface the excavation. <br /> 8/27/98 - 8/27/98 Drilling subcontractor will install groundwater monitoring wells under the <br /> supervision of,ATC personnel and the San Joaquin County Public Health <br /> Services Environmental Health Division. Selected soil samples will be <br /> submitted to a'State-certified laboratory for analysis. <br /> 8/31/98 - 8/31/98 ATC personnel will develop and sample the groundwater monitoring well. <br /> The groundwater sample will be submitted to a State-certified laboratory <br /> for analysis. <br /> 9/21/98 - 9/25/98 A Subsurface, Investigation Summary Report will be prepared and <br /> submitted to the appropriate regulatory agencies. <br /> I' <br /> i� <br /> wA172951sb20041presdLdoc i <br />