My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
117
>
3500 - Local Oversight Program
>
PR0545260
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:52:52 PM
Creation date
1/30/2020 11:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545260
PE
3528
FACILITY_ID
FA0005325
FACILITY_NAME
INLAND PAINT COMPANY
STREET_NUMBER
117
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707031
CURRENT_STATUS
02
SITE_LOCATION
117 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3Y- <br /> (VYATC <br /> A S S O C I A T E S I N C <br /> ESTIMATED BUDGET <br /> FOR SOIL EXCAVATION AND DISPOSAL AND: <br /> WELL INSTALLATION AT. <br /> 117 West Harding Way, <br /> Stockton, California <br /> (Page 2 of 3) <br /> Task 3: Installation of Three Borings and Three Monitoring Wells <br /> Professional Services . , <br /> Staff Geologist (14 hr @ $50) 700 <br /> Admin/Accounting (1 jhr;@ $45) 45 <br /> Subcontractor(driller) f , >; 4,948 <br /> Laboratory Analysis <br /> TPHg/BTEX (6 samples @ $44) 264 <br /> TPHd (6 samples @ $50) b 300. <br /> TPHss (6 samples @ $50) 300 <br /> Equipment <br /> PID (1 day @ $100) 100 <br /> Mleage (60 miles @ $0.40) r ¢ 24 <br /> Task 3 subtotal: t $ 6,681, <br /> Task 4: Groundwater Monitoring Well Develo ment <br /> Professional Services <br /> Field Technician (9 hrs @ $45) 405 <br /> Laboratory Analysis <br /> TPHg/BTEX (3 samples @ $44) 132 <br /> TPHd (3 samples @ $50) 150 <br /> TPHss (3 samples @ $50) 150 <br /> Oxygenate fuel additives (3 samples @ $121) 363 <br /> Equipment <br /> Well development system (1 day @ $100) 100 <br /> Water level indicator (1 day.@ $25) 25 <br /> pH/Temp/Conductivity meter (1 day @ 25) 25 <br /> Disposable bailers (3 @ $13) 39 <br /> Drums (2 @ $40) 84 <br /> Mileage (60 mules @ $0.40) 24 <br /> Task 4 subtotal: $ 1,493 <br />
The URL can be used to link to this page
Your browser does not support the video tag.