Laserfiche WebLink
A S S O C I A T E S I NI C , <br /> r <br /> ESTIMATED BUDGET <br /> FOR SOIL EXCAVATION AND DISPOSAL AND <br /> WELL INSTALLATION AT <br /> 117 West Harding Way <br /> Stockton, California <br /> (Page 3 of 3) <br /> Task 5: Summaa Report Preparation <br /> Professional Services <br /> Project Manager (2 hrs @ $85) $ 170 <br /> Staff'Scientist (13 hrs @ $50) 650 <br /> Draftsperson (3 hrs @ $45) <br /> 135 <br /> Admin/Accounting (I hr @ $45) 45 <br /> Task 5 subtotal: $ 1,000 <br /> TOTAL ESTIMATED BUDGET: $16,163 <br /> CONTINGENCY COSTS <br /> Deep Well Installation and Soil Sampling and Analysis $ 3,807 <br /> Deep Well Development and Groundwater Sampling and Analysis 553 <br /> Additional Report Preparation 273 <br /> TOTAL CONTINGENCY COSTS: $ 4,633 <br /> i <br /> 1 <br />