Laserfiche WebLink
GRANITE CONSTRUCTION—FRENCH CAMP Page 4 <br /> WKA No. 2088 09 <br /> March 12, 2003 <br /> • Removing the top five feet of well casing from each of the wells using a truck- <br /> mounted drill ng equipped with hollow-stem augers Soil cuttings will be spread <br /> onsite <br /> • Preparing a well abandonment report <br /> Should you have questions regarding our report of findings or well abandonment workplan, <br /> please do not hesitate to contact us <br /> Wallace Kuhl Ass iat Inc p <br /> �,:• xu ••°�, <br /> BA EK <br /> No 1� <br /> c <br /> ra <br /> ••t I:cioctsT; <br /> atthew A Taylor Kurt Balasek OFC <br /> • Senior Environmental Specialist Senior Hydrogeologist R.G , C H <br /> MAT K1VIB lmb <br /> Copy to Mr Hop Essick, Granite Construction Company <br /> Mr Mark List, CVRWQCB <br /> Hldept 31Actjobs12088 09 ROF(4th Quarter 2001) <br /> • <br /> WALLACE KUHL <br /> Renckdpaper fyASSOCIATES INC <br />