My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002586
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:43:52 PM
Creation date
1/30/2020 1:37:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002586
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALLACE • KUML February 25, 1997 <br /> Er ASSOCIATES INC. <br /> Mr Hop Essick <br /> Granite Construction <br /> Post Office Box 151 <br /> Stockton, California 95201 <br /> QUARTERLY GROUNDWATER MONITORING REPORT <br /> GRANITE CONSTRUCTION FACILITY <br /> 10500 South Harlan Road <br /> French Camp, California 95231 <br /> WKA No 2088 08 <br /> Dear Mr Essick, <br /> We are submitting this quarterly groundwater monitoring report summarizing our <br /> recent work at the above-referenced site (Plate 1) The purpose of our work is to <br /> comply with quarterly sampling requirements requested by the Central Valley <br /> �4 Regional Water Quality Control Board (CVRWQCB) and the San Joaquin County <br /> Geotechnical Engineering Public Health Services Department (SJCPHS) <br /> Engineering Geology <br /> � On January 23, 1997, groundwater samples were obtained from the four monitoring <br /> Environmental Consulting wells (MW1 through MW4) Monitoring wells MW5 through MW7 were not <br /> sampled at the request of Mr Harlin Knoll of SJCPHS Prior to sampling, the wells <br /> Remediation Services <br /> were checked for visual signs of free product by using a clear, Teflon*bailer <br /> Construction Inspection When free product was not observed, the wells were purged and sampled as <br /> Materials Testing described in Appendix A The groundwater samples were analyzed for Total <br /> Petroleum Hydrocarbons as gasohne(TPH g) and diesel (TPH-d) using EPA <br /> method 8015 modified and for Benzene, Toluene, Ethylbenzene, and Xylenes <br /> (BTEX) using EPA method 602 In addition, water samples were analyzed for <br /> 3050 industrial Blvd <br /> Methyl Tertiary Butyl Ether (MTBE) using EPA method 602 <br /> West Sacramento <br /> r CA 95691 <br /> Groundwater measurements indicate groundwater flow direction has changed from <br /> Fax 916 372 2565 <br /> a northwest direction to a southwest direction with a hydraulic gradient of <br /> 916 372 1434 <br /> Recycled paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.