My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002586
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:43:52 PM
Creation date
1/30/2020 1:37:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002586
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GRANITE CONSTRUCTION FACILITY <br /> WKA No 2088 08 <br /> February 25, 1997 <br /> Page 2 <br /> approximately 0 004 feet/foot (see Plate 2) It is our opinion that the new flow direction to the <br /> southwest is probably due to recent rains and flooding of areas in San Joaquin county A <br /> historical summary of the groundwater elevations measured during past sampling events is <br /> summarized in Table I <br /> Laboratory test results for the water samples obtained from monitoring wells MW 1 through MW3 <br /> revealed detectable concentrations of TPH-g and BTEX Monitoring well MW4 revealed no <br /> detectable concentrations of TPH-g, TPH-d, or BTEX MTBE was not detected in any of the <br /> four monitoring wells sampled Analytical results of groundwater samples obtained from the four <br /> monitoring wells are summarized in Table 2 Chain-of-custody documentation and laboratory <br /> reports are included in Appendix B <br /> At the request of Mr Harlin Knoll of SJCPHS, the closure committee meeting previously <br /> scheduled for March 5 has been changed to March 20, 1997 I will contact you one to two <br />. weeks prior to the meeting to confirm the time, date, and place Please call if you have any <br /> questions regarding this report <br /> Wallace ■ Kuhl & Associates, Inc <br /> Michael Watan Eric Hubbard <br /> Staff Engineer Registered Geologist 94807 <br /> MMW EJH sdm <br /> Copies to Mr Harlin Knoll, SJCPHS <br /> Ms Elizabeth Thayer, CVRWQCB <br /> h%Mk20Ag4S QTI <br /> INK <br /> WALLACE KUHL <br /> RM&-dpaper ErASSOCIATES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.