Laserfiche WebLink
Kyle Christie <br /> Page 2 <br /> PHS / EHD will write a letter to the northern property owner <br /> upon receipt of a written request from ARCO . Due to continued <br /> late receipt of quarterly monitoring reports , PHS / EHD will <br /> allow a change in quarterly months from the standard to <br /> accommodate EMCON ' s heavy load of same due date for all other <br /> quarterlies . ARCO is to request the change if desired . The <br /> site is to continue soil vapor extraction as soon as repairs <br /> are completed on the system . There are no PHS / EHD deadlines <br /> currently pending for this site . <br /> 441 W . Charter Way , Stockton ARCO Facility #2168 <br /> PHS / EHD contact - Michael Infurna <br /> ARCO has requested that a meeting be set up between PHS / EHD <br /> representatives ( Linda Turkatte and Michael Infurna ) , ARCO <br /> representatives and Texaco representatives , to discuss the <br /> Charter Way sites and investigations . The future of this site <br /> as an ARCO facility is undetermined since the lease renewal <br /> time is near . If the lease is terminated , the tanks will be <br /> removed . ARCO is to advise PHS / EHD of the plans as they are <br /> decided . ARCO plans to drill angle and vertical borings <br /> around the existing tank area , but the work plan has not been <br /> finalized . Onsite monitoring wells MW3 and MW4 have a sheen <br /> on the water and the gradient is still to the northeast . ARCO <br /> discussed that the vapor extraction unit originally planned <br /> for use at 1612 Hammer Lane , Stockton or 225 Cherokee Lane , <br /> Lodi , may be taken to this site instead . ARCO will advise <br /> PHS / EHD of the decision made . There are no PHS / EHD deadlines <br /> currently pending for this site . <br /> 25775 Patterson Pass Road , Tracy ARCO Facility # 6100 <br /> PHS / EHD contact - Margaret Lagorio <br /> Mr . Robert Vieira has signed the access agreement for drilling <br /> on his property . A work plan will be submitted to PHS / EHD and <br /> the work will be conducted this spring . <br /> 501 W . Kettleman Lane , Lodi ARCO Facility # 434 <br /> PHS / EHD contact - Margaret Lagorio <br /> The monitoring well replacement MW2 has been sampled and there <br /> were no contaminants detected . This well will be placed on <br /> the quarterly sampling schedule . The soil generated during <br /> the installation of replacement MW2 was transported by Dillard <br /> Trucking to their facility on December 30 , 1994 . After <br /> receipt of the sample results , disposal of the soil was <br /> arranged . The biofilter has been permitted by San Joaquin <br /> Valley Unified Air Pollution Control District ( SJVUAPCD ) so <br /> the catalytic oxidizer currently at this site will be <br /> transferred to the site at 3425 N . Tracy Blvd . , Tracy . <br /> 2908 West Benjamin Holt , Stockton ARCO Facility #2133 <br /> PHS / EHD contact - Mary Meays <br /> PHS / EHD staff indicated that notification prior to the start - <br />