Laserfiche WebLink
Kyle Christie <br /> Page 3 <br /> up of the vapor extraction was requested and that due to very <br /> short notice , PHS / EHD staff was unavailable to provide an <br /> inspection . PHS / EHD requested that the next time a site visit <br /> is made that PHS / EHD be notified so that an inspection can be <br /> scheduled . PHS / EHD also stressed the importance , once again , <br /> of timely submittal of quarterly reports . PHS / EHD was also <br /> notified that the air sparging system was started-up . PHS / EHD <br /> requested information regarding the operation of the system <br /> and indicated that no notification of its start -up was <br /> provided . PHS / EHD also stated that the report of the <br /> installation of the additional offsite wells should be <br /> submitted as soon as possible . <br /> 800 East Kettleman Lane , Lodi ARCO Facility # 2076 <br /> PHS / EHD contact - Mary Meays <br /> PHS / EHD was provided a copy of the " Fourth Quarter 1994 Status <br /> Report " from EMCON . PHS / EHD requested that the quarterly <br /> report be submitted prior to the scheduled quarterly meeting <br /> in order for PHS / EHD staff to evaluate recent results in order <br /> to discuss site conditions . <br /> 1612 Hammer Lane , Stockton ARCO Facility # 548 <br /> PHS / EHD contact - Mary Meays <br /> PHS / EHD was provided a copy of the " Fourth Quarter 1994 Status <br /> Report" from EMCON . PHS / EHD requested that the quarterly <br /> report be submitted prior to the scheduled quarterly meeting <br /> in order for PHS / EHD staff to evaluate recent results in order <br /> to discuss site conditions . PHS / EHD also received a copy of <br /> the site comparison between 1612 Hammer Lane and 225 South <br /> Cherokee Lane which was prepared to evaluate residual soil <br /> contamination . PHS / EHD indicated that the report would be <br /> reviewed and PHS / EHD comments prepared . <br /> 3425 N . Tracy Blvd . , Tracy ARCO Facility # 2093 <br /> PHS / EHD contact - Harlin Knoll <br /> Groundwater and soil contamination exist both on and off site . <br /> ARCO stated a vapor extraction system would be installed after <br /> receiving an " Authority to Construct " from SJVUAPCD . <br /> Construction should begin and be completed during the second <br /> quarter of 1995 . Onsite remediation will be on line and <br /> operating by the third quarter of 1995 according to ARCO and <br /> Brown and Caldwell . Offsite contamination in monitoring well <br /> MW8 will not be incorporated into the initial system design <br /> but will be monitored and managed in the future . <br /> 85 E . Louise , Lathrop ARCO Facility # 6080 <br /> PHS / EHD contact - Linda Turkatte <br /> The annual report was submitted and the wells show nondetect <br /> levels . The possibility of evaluating this site for closure <br /> will be discussed at the next quarterly meeting . <br />