Laserfiche WebLink
KYLE CHRISTIE <br /> PAGE 5 <br /> current data from the area of monitoring well MVV#2, ARCO would like to postpone the confirmation <br /> drilling until such a time that the other site data indicate it to be warranted. PHS/EHD agreed that this <br /> was a more cost effective approach . The San Joaqiun Valley Unified Air Pollution Control District has <br /> approved the biofilter for use in place of the Catalytic converter. A new blower has been purchased to <br /> allow remediation to continue at the site once the catalytic converter is moved to ARCO station #2093 <br /> in Tracy . <br /> The environmental assessment conducted across Kettleman Lane at 514 Kettleman Lane has been <br /> completed with the installation of two monitoring wells . The report has not yet been submitted but <br /> preliminary results indicate no contamination in the soil or the groundwater. The report should be <br /> submitted soon and will be available for public review. <br /> Summary <br /> The meeting allowed for continued communication between all parties and for <br /> continued progress at the sites . The next meeting to discuss site progress was <br /> scheduled tentatively for February 14 , 1994 at 10 : 00 AM at the office of PHS/EHD . <br /> If you disagree with this summary of the November 14 , 1994 meeting or have any <br /> questions , please contact me at (209) 468-3452 . <br /> Donna Heran , REHS , Director <br /> Environmental Health Division <br /> Diane M . Hinson , REHS <br /> Supervisor <br /> c: Elizabeth Thayer, CVRWQCB c: Jay Johnson , EMCON <br /> c: Ron Zurlinden , B&C c: Steve Meisner, B&C <br />