Laserfiche WebLink
Mr. Wilbur Smith Project 0805- 141 .03 <br /> April 24. 1997 <br /> Page 2 <br /> for the construction of the monitoring wells is the begirtning of July 1997 . Upon receipt of your <br /> authorization, we will schedule a date for our work and inform you of that date. <br /> Once the wells are drilled and installed, an EMCON technician will periodically monitor and <br /> maintain the wells for approximately 1 year, or as required by SJCPHS . After the wells are no <br /> longer needed, it will be properly destroyed by drilling it out with a 10-to 12-inch-diameter auger <br /> and backfilling the borehole with neat cement. The ground surface will then be restored to <br /> resemble the surrounding ground material. <br /> We appreciate your cooperation in this matter. As the Lincoln Properties representative, please <br /> sign and return both copies to our office. We will forward both copies to ARCO. ARCO will then <br /> sign both copies and return one copy to you for your files. <br /> Please feel free to call if you have any questions about the work. <br /> Sincerely, <br /> EMCON <br /> Claudio Avila ay�Johnso . <br /> Project Geologist S% or Pro t Supervisor <br /> Attachments: Figure 1 Area Map <br /> Figure 2 Well Details Sample Sheet <br /> ARCO Products Company Access Agreement (two copies) <br /> cc: Paul Supple, ARCO Products Company <br /> Mary Meays , San Joaquin County Public Health Services <br />;i <br /> i <br /> SAON:\PJP0 OM051410.3ES-95VIb:1 <br />