Laserfiche WebLink
Mr. Will Smith Project 0805- 140.03 <br /> November 28, 1995 <br /> Page 2 <br /> present during drilling. Every effort will be made to keep the work area clean and to <br /> restore the area to the original condition when the work is completed. We will contact you <br /> to coordinate drilling operations and to determine which day of the week is most <br /> convenient. Our tentative schedule for the construction of the monitoring wells is <br /> rid-January 1996 . Upon receipt of your authorization, we will schedule a date for our <br /> work and will inform you of that date. <br /> Once the wells are drilled and installed, an EMCON technician will periodically monitor and <br /> maintain the wells for approximately I year, or as required by SCEMD . After the wells are <br /> no longer needed, the wells will be properly destroyed by drilling it out with a 10- to <br /> 12-inch-diameter auger and backfilling the borehole with neat cement. The ground surface <br /> will then be restored to resemble the surrounding ground material. <br /> We appreciate your cooperation in this matter. As the Lincoln Properties representative, <br /> please sign and return both copies to our office. We will forward both copies to <br /> ARCO. ARCO will then sign both copies and will return one copy to you for your <br /> files. <br /> Please call if you have any questions about the work. <br /> Sincerely, <br /> EMCON <br /> 6 <br /> Claudio Avila Ja . J son <br /> Project Geologist eni 4 <br /> oject Supervisor <br /> Attachments: Figure 1 Area Site Map <br /> Figure 2 Well Details Sample Sheet <br /> ARCO Products Company Access Agreement (two copies) <br /> cc: Kyle Christie, ARCO Products Company <br /> Mary Maeys, San Joaquin County Public Health Services' <br /> i <br /> I <br /> I <br /> SA(:W:\PJM80508051400.3('S-95\pw:2 <br />