My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:05:50 PM
Creation date
1/30/2020 1:53:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
www <br /> SECOR 3017 Kilgore m <br /> 3077 Kilgore Road,Suite 100 <br /> INTERN �4 NAL 9 <br /> 5C IN <br /> �C <br /> 1ORPORATED Rancho Cordova,CA 95670 <br /> 0 916 <br /> C E[ 1v DD 916-861-04030 FAX <br /> DEC, 2 0 2006 <br /> December 18, 2006 <br /> ENVIRONMENT HEALTH <br /> PERN'IT;SERVICES <br /> Mr. Nuel Henderson, Jr. <br /> San Joaquin County Environmental Health Department <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, CA 95202-2708 <br /> RE: Summary of December 7, 2006 Meeting <br /> ARCO 548 — 1612 Hammer Lane, Stockton <br /> ARCO 5469— 130 South Wilson Way, Stockton <br /> ARCO 6100—25775 South Patterson Pass Road, .Tracy <br /> Dear Mr. Henderson: <br /> i <br /> On behalf of Atlantic Richfield Company, a BP Affiliated,Company, SECOR International <br /> Incorporated (SECOR) expresses our appreciation to you and your team at the San <br /> Joaquin County Environmental Health Department (SJCEHD) for the opportunity to review <br /> the current site conditions and develop a mutually agreeable .plan to conduct additional <br /> assessment and/or remediation at the above-referenced sites. Present at the meeting were <br /> Mr. Nuel Henderson, Ms. Lori Duncan, and Ms. Margaret Lagorio of the SJCEHD, Mr. Don <br /> Pratt of Atlantic Richfield, and Mr. Rusty Benkosky, Mr. '3Jaff A'uchterlonie, and Ms. Kristi <br /> Shelton of SECOR. <br /> The purpose of this letter is to document our understanding ',of the assessment and/or <br /> remedial approach agreed to at our meeting on December 7,X2006. A summary of the <br /> meeting discussion and action items are discussed below.'! <br /> ARCO 548 — 1612 Hammer Lane, Stockton <br /> SECOR will prepare and submit a revised Biosparging Work Plan outlining the approach for <br /> the feasibility testing of the air sparge system at the site. The feasibility testing will include <br /> collection of baseline biological parameters for three months ,prior to restarting the air <br /> sparge system. The air sparge system will then be activated in order to stimulate biological <br /> activity and will operate for approximately one year. Biological parameters will be collected <br /> monthly during system operation. A reevaluation of the Visite will be conducted following <br /> i operation the system. The evaluation will involve comparing the site data collected during <br /> system operation to the baseline data previously collected. In addition, SECOR will <br /> examine the 1,2-DCA concentration in site monitoring wells. It:was agreed that this work <br /> plan will be submitted in lieu of the Remedial Action Plan requested in the recent SJCHED <br /> letter dated November 2, 2006. The work plan will be submitted by January 15, 2007, <br /> ARCO 5469— 130 South Wilson Way, Stockton <br /> SJCEHD believes there may be commingling of the three plumes in the area. Site <br /> Conceptual Models (SCMs) have been requested for all three sites. A previous work plan <br /> prepared by Stratus Delta dated March 2, 2002 outlined the installation of three offsite <br /> monitoring wells to delineate the site. Installation of the'.offsite wells has been delayed <br /> IN31P-ARCO104 BP Valley PortfolioWristi S Files112-7-06 SJCEHD Meeting Notes.ldoc <br /> 1 <br /> 3 I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.