My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0012708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:56:58 PM
Creation date
1/30/2020 2:01:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012708
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - - - <br /> r <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No.548, Stockton, California AGS 30004-2 <br /> FIEM PROCEDURES <br /> Safety Plan <br /> The Site Safety Plan(Appendix D) describes the basic safety requirements for the drilling <br /> of soil borings at the work site. The safety plan is applicable to personnel of Applied <br /> a GeoSystems and to subcontractors of Applied GeoSystems. The Applied GeoSystems <br /> geologist will act as the Site Safety Officer. Personnel at the site will be informed of the <br /> contents of the site safety plan before work begins. A copy of the plan will be kept at the <br /> work site and will be available for reference by appropriate parties during the work. <br /> A <br /> Excavation of Existing Tank Cavity <br /> A geologist from Applied GeoSystems will be onsite to observe exca�iation of tite soil from <br /> bothtank cavities. Immediately following the removal of the four exist ing`underground= <br /> `storage tanks,.the tank cavity will.be excavated to a,depth between 2 and 4 feet below the <br /> {, former tanks to evaluate if hydrocarbons"remain in place. Du <br /> rin$excavation,the geologist, <br /> will use a'PID to characterize the relative levels-of hydrocarbons in the soil and note'any <br /> -�dbjective evidence:of hydrocarbons such as obvious product odor and discoloration. Field <br /> instruments such as the PiD are useful for indicating relative levels of hydrocarbon vapors, <br /> but do not detect the concentration of hydrocarbons present with the same precision as <br /> laboratory analyses. <br /> 0 <br /> We will collect two soil sample's within'2 to.4 feet below the base of.each forrher.tank. If <br /> PIDreadings are less than 50 ppmv,`_we will._submif_the-soil:samples_to_theJaboratory-.for.. <br /> analyses :If PID"readings'are.greater than 50 ppmv we will observe additional excavation <br /> in the gasoline-tank cavity until PID readings are less than 50p0mv and submit these"sail. <br /> AppAied 4700Sj`Wems <br />
The URL can be used to link to this page
Your browser does not support the video tag.