My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
3500 - Local Oversight Program
>
PR0545246
>
ARCHIVED REPORTS_XR0012708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:56:58 PM
Creation date
1/30/2020 2:01:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012708
RECORD_ID
PR0545246
PE
3528
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
02
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-:-��� -_ �nrirunntcnl�lSuheltort± <br /> Through f%pplivri 5c'icncr, <br /> �1�°�eO�' Fngirtrcrinl;l Cuns(ruefiurt <br /> A RES4A Crrrnpsnr <br /> C <br /> 316a GOW Camp hnve, . <br /> Ranryto Cordova,C,\95670 <br /> SAF,_rTy PLAN No. 30004-45 <br /> �•• vIV ONMENTAL=NVESTIGA'TION <br /> SITEN <br /> SUBSURFACE Eat the o 548 <br /> ARCO Service Station N <br /> 1512 Hammer Lane <br /> Stockton, Calyfornla <br /> t~ (June 21, 1991) <br /> I1zMODUC�ON requirements for the subsurface environmental lied <br /> a 1 to the employees of ApP <br /> This Site Safety Plan describes basic safety this Plan appy ro ect. The subcontractors <br /> The provisions set forth in on this phase of the p Jor increase the safety <br /> int'estigation. but only to upgrade designated and <br /> GeoSystems and its subcontractors <br /> y these <br /> working lied GeoSystems. as <br /> may elect to modify these provisions, <br /> ecto and only with the concurrence of APP <br /> requirements, be encountered <br /> accepted in writing- <br /> expected potential hazards than gon approval of the <br /> Plan will address the exp Plan to beg <br /> This Site Safety . Field activities are p <br /> ite for this project Environmental Health DivisieS with <br /> 1s tehordw°,king <br /> on the worksuin County <br /> plan by the San 3oaq plan will be prc"rided by Applied <br /> work p toximately 1 month after the start date. If change <br /> estimated at aPP activities Progress, addenda to this p <br /> conditions occur as <br /> GeoSystems- <br /> AUTHORM FOR SITES TY Project Manager <br /> ro ect safety are the pro] onsible for <br /> stems personnel responsible for p 1 Coordinator is resp <br /> The Applied ,,eoSy ince,. <br /> The,Health an P)gra and may choose to audit the <br /> eologist or Eng a Project <br /> and the Staff G lied GeoSystems Health and Safety providing a copy <br /> overall App appropriate action to c°f this planeI.,pcor <br /> the o liance and take PP the provisions oGeologist <br /> site for camp implementing the Staff <br /> Manager is responsible for imp int or Engineer, and for advis'sng <br /> !an to the Staff Geolog The project Manager and Staff Geologist or <br /> of this p matters. liance with the Provisions of this <br /> Engineer on health and safety <br /> to audit site activities for comp <br /> have the authority work practices or dismiss subcontractors whose Conduct <br /> Engineer end or modify <br /> - Pian. They <br /> may rasp specified in thi plan' <br /> does not meet the requirements -: ,.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.