Laserfiche WebLink
_ :-� �•�:- �,. �.. ,fir <br /> ,,i a - t <br /> rte. <br /> June 21, 1991 <br /> ARCO Station No.548 <br /> ned <br /> The Staff Geologist or Engineer is responsible foeonnelmas gned communicating <br /> ecl andation tothe <br /> in this Pian to the Applied GeoSystems Pers Applied GeoSystems on the <br /> responsible representative of each subcontractor working for <br /> project. <br /> The Staff Geologist or Engineer will also act as 1lne Site itiow gff{ems As such,the Staff <br /> Geologist or Engineer is responsible for addressing <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> �. o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> he or she <br /> nds <br /> The Staff Geologist or Engineer has the <br /> Uuate foroworker suspend <br /> afety. anywork time <br /> Staff Geologist r <br /> that the provisions of the Plan are q <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this Plan. <br /> MEDICAL SUR.VEILI ANCE <br /> ersonneI and subcontractors engaged in project aetivitier must <br /> Applied GeoSysterns p and must <br /> participate in a iing <br /> n surveillance protection devices and protebtivelclothing forhwork working <br /> physician(s) to we respiratory pr <br /> hazardous materials. The applicable requirements of Title S,Section under of the Gah ornia <br /> Administrative Code will be observed. The applicable requirements under 29 CFR i`.910.120 <br /> of the Federal Administrative Code will also be observed. <br /> SAFE'T'Y AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a projcct- <br /> efore <br /> specific training meeting for safety issu <br /> esand anagereview ihe project tasks or Staff Geologist or Engineer. ng <br /> In <br /> work. The meeting will be led by the Pr J <br /> 2 <br /> �f Acs 30004-45 <br />