Laserfiche WebLink
.n <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 548, Stockton, California AGS 30004-2 <br /> delineation of hydrocarbons in soil not excavated. ARCO will then evaluate remedial <br /> options based on the results of the delineation. <br /> REPORT'PREI�ARATION <br /> ® We will prepare a report summarizing our field methods,laboratory procedures,laboratory <br /> results, and conclusions. The report will also contain cross sections and maps.(as <br /> appropriate)to illustrate sample locations and the extent of excavation. The report will be <br /> submitted to the SJPHS within 90 days of the completion of the field work. Information <br /> gathered will be considered confidential and released only with authorization of ARCO. <br /> r <br /> PROJECT PERSONNEL <br /> �'�•' Mr.John Bailey Bobbitt,a Registered Geologist(R.G.4313)in the State of California,will <br /> be in charge of the project. Ms.Eloise prick,Project Geologist,will manage field and office <br /> operations. Applied GeoSystems employs a staff of engineers, geologists, and technicians <br /> whose services will be used to see the project through to completion. <br /> 3 <br /> 18 <br />