Results of Initial Investigation and Work Plan December 18, 1490 <br /> ARCO Service Station No. 548,Stockton, California AGS 30004E-2 <br /> modified EPA Method 8015,W[EX using EPA Method 8020,and total oil and grease using <br /> Standard Method 503e,volatile organic compounds using EPA Method 8010,base neutrals <br /> ® and acids with open scan for creosote using EPA Method 8270, and metals cadmium, <br /> chromium,lead,nickel and zinc). After the excavation of the waste oil cavity is terminated, <br /> additional sail samples will be collected to evaluate the vertical or;afetal extent of waste <br /> oil. Additional soil samples will be analyzed for the compounds detected in the soil sample <br /> collected from under the fill pores as discussed in the section titled, Excavation of the <br /> Waste-Oil Cavity. <br /> All laboratory results will be discussed with ARCO personnel and with ARCO's approval <br /> for-warded to the S3PHS. A copy of z signed Authorization to Release Analytical Data farm <br /> w <br /> is included in Appendix C of this work plan. The new tanks will be installed and the waste- <br /> oil cavity will be backfilled after the S3PHS receives the laboratory reports and approves <br /> Tank installation. <br /> OBTAwING APPROVAL FOR TANK INSTALLATION <br /> 40 <br /> With ARCO's approval, laboratory results and a sample location map will be provided to <br /> the SJPHS to exredite the installation of the new underground storage tanks. The letter of <br /> �. acknowledgment,included in Appendix C of this workplan, commits ARCO to submitting <br /> either a Soil Contamination Work Plan or a report on the tank removal investigation within <br /> 3 months of completing the field work. If laboratory results indicate TPHg concentration <br /> -greater than 10:ppm,BTEX concentrations greater than 1.0 ppm ar:TOG:concentrations <br /> lie <br /> greater,fhan.100,pp remain in place at the base of either excavation;Applied GeoSystems <br /> -- t _ <br /> will reconrmend that ARCO submit the Soil'Contamination Work Plan within 3 monfP�s.of. <br /> The Work Plan will describe proposed procedures for further <br /> completing the field work. Th <br /> 17 <br /> Aw <br /> .4,�p1i0d 060Syst�r�s <br />