Laserfiche WebLink
Y <br /> I <br /> FFREM <br /> lled GeoSystems 4191-E Power Inn Road, Sacramento, CA 95626 (916)452-2901 <br /> ONT a IRVINE • HOUSTON a BOSTON a SACRAMENTO a CULVER CITY D SAN 105E <br /> SITE SAFETY PLAN No. 30004-1S <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No. 548 <br /> 1612 Hammer Lane <br /> Stockton, California <br /> (March 23, 1990) <br /> INTRODUCTION <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation. The provisions set forth in this Plan apply to the employees of Applied <br /> q GeoSystems and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to modify these provisions, but only to upgrade or increase the safety <br /> requirements, and only with the concurrence of Applied GeoSystems, as designated and <br /> accepted in writing. <br /> f, y This Site Safety PIan will address the expected potential hazards that may be encountered <br /> ,„,r on the worksite for this project. Field activities are planned to begin as soon as ti::e have <br /> approval from San Joaquin county with the duration estimated at approximately'5 days <br /> afterthe start date. If changes in site or working conditions occur as activities progress, <br /> addenda to this plan will be provided by Applied GeoSystems. <br /> AUTHORITY FOR SITE SAFETY <br /> The Applied GeoSystems personnel responsible for project safety are the Project Manager <br /> and the Staff Geologist or Engineer. The Health and Safety Coordinator is responsible for <br /> the overall Applied GeoSystems Health and Safety Program and may choose to audit the <br /> site for compliance and take appropriate action to correct deficiencies. The Project <br /> Manager is responsible for implementing the provisions of this Plan, for providing a copy <br /> of this Plan to the Staff Geologist or Engineer, and for advising the Staff Geologist or <br /> Engineer on health and safety matters. The Project Manager and Staff Geologist or <br /> Engineer have the authority to audit site activities for compliance with the provisions of this <br /> Plan. They may suspend or modify work practices or dismiss subcontractors whose conduct <br /> does not meet the requirements specified in this PIan. <br /> The Staff Geologist or Engineer is responsible for communicating the information contained _ <br /> _ in this Plan to the Applied GeoSystems personnel - sined to the <br /> g project and to the. <br /> responsible representative of each subcontractor working for Applied GeoSystems on the <br /> project. <br /> I <br /> HEN <br /> +fir <br />