Laserfiche WebLink
c <br /> u T <br /> am ME <br /> Site Safety Plan March 23, 1990 <br /> ARCO Station 548, Stockton, California AGS 30004-IS <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such, the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> ® o Implementing the Site Safety Plan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend wot;c a, trr�e he or she finds <br /> that the provisions of the Plan are inadequate for worker sa ''1: 'Z`'ie Staff(ie=fllogist or <br /> Engineer will inform the Project M,,tnager and the Health ani % i e ty Cc;)rdinator promptly <br /> of deficiencies within the Plan or individuals or subcn!-Jractors wfi:.pse <anduct is n-a <br /> consistent with the requirements of this Pian. <br /> MCEDICAL SURVEILLANCE <br /> Applied GeoSystems personnel and subcontra_s yrs eisgagea - roje: t actinitis must <br /> participate in a medical surveillance program Siad ffiu!0 be cleared b� the examining <br /> physician(s) to wear respiratory protection devices and PS•otective riogli ng for working with <br /> hazardous materials. The applicable requirements of' Ifle" ; crlan 5216,of the California <br /> Administrative ode will be observed, Th i; b�.e c equi.remcmis under 29 CFR <br /> 1910.120 of the Federal Administrativ; ('ode will <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> work. .The meeting will be led by the Project Manager or Staff Geologist or Engineer. In <br /> addition,fit testing of respiratory protective devices will be conducted as part of the safety <br /> orientation meeting when the use of a respirator may be required. <br /> ,f <br /> 2 <br /> .4w,o/ieo' �eoSyste�rle <br />