Laserfiche WebLink
DISCUSSION: <br /> TPHG and BTEX were not detected in the samples collected from monitoring wells MW-2 through MW-6, <br /> consistent with the previous quarter. Benzene, toluene and total xylenes were detected in the sample <br /> collected from monitoring well MW-1 at concentrations of 0.892 µg/l, 1.43 µg/I and 1.80 µg/I, respectively. <br /> MTBE was detected in the samples collected from monitoring wells MW-1 and MW-6 at concentrations of <br /> 19.0 µg11 and 2.12 pg/l, respectively. <br /> Delta conducted six site visits during the first quarter 2001 to measure and bail free-phase petroleum <br /> hydrocarbons in vapor extraction well VW-5D. Thickness of free product varied from a maximum of <br /> 2.7 feet(01/11/01) to 0.23 feet (03/15/01) (see Table 3). A total of approximately 4 gallons of free product <br /> was recovered during the quarter. <br /> The groundwater flow direction was calculated to be towards the east at an average gradient of 0.0021 <br /> ft/ft. An east groundwater flow direction is consistent with previous quarters. The groundwater elevation <br /> increased 1.29 feet (MW-2) to 1.49 feet (MW-6) in the monitoring wells since the previous sampling event <br /> (December 2000). <br /> A Delta technician conducted bimonthly site visits to optimize and maintain the SVE/AS system. The AS <br /> system was shut down during the first quarter (01/11/01) due to the presence of free product in well VW- <br /> 5D. Approximately 216 lbs of TPHG as gasoline was removed during the first quarter 2001, and a <br /> cumulative mass of 694.52 lbs since startup (09/28/00). Delta will optimize the operation of the SVE <br /> system by increasing flows, and therefore influent concentrations, by changing the vacuum and flows from <br /> the individual wells. The SVE system was in compliance with San Joaquin Valley Unitfied Air Pollution <br /> Control District permit to operate. <br /> • ATTACHMENTS: <br /> • Table 1 Groundwater Monitoring Data <br /> • Table 2 Groundwater Analytical Results for Oxygenates and Additional Compounds <br /> • Table 3 Floating Product Monitoring Summary, Well VW-5D <br /> • Table 4 Operational Uptime Information of the Soil Vapor Extraction System <br /> • Table 5 Flow Rates and Analytical Results of Air Sample Analyses <br /> • Table 6 Extraction and Emission Rates <br /> • Figure 1 Site Location Map <br /> • Figure 2 Groundwater Elevation Contours (First Quarter 2001) <br /> • Figure 3 Groundwater Analytical Summary(First Quarter 2001) <br /> • Appendix A Field Data Sheets <br /> • Appendix B Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports and Chain-of-Custody Records <br /> CAARC0105481QTRLY1200110548 QIGI.doc Delta <br /> 05/23/01 <br />