My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:50:48 PM
Creation date
1/30/2020 3:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VWntec <br /> Quarterly Status Summary Report—Fourth Quarter 2011 <br /> 76(Former BP) Service Station No. 11193 <br /> January 31, 2012 <br /> Transportation (Cal-Trans), which was screened from approximately 214 ft to 350 ft below <br /> ground surface, and located approximately 315 ft west of the site. According to Cambria, the <br /> Cal-Trans well had been destroyed in preparation for reconfiguration of the Interstate 5 and <br /> Hammer Lane interchange. According to Mr. Witzak Gilon of the City of Stockton Municipal <br /> Water System (CSMWS), there were no CSMWS water supply wells located within the 2,000- <br /> foot search radius. <br /> Monitoring and Sampling <br /> No monitoring and sampling was performed during 4Q11. In an email correspondence dated <br /> September 29, 2011, San Joaquin County Environmental Health Department (SJCEHD) <br /> approved the suspension of monitoring and sampling of the well network pending site closure. <br /> Current Assessment Activities <br /> Between the dates of December 5, 2011 and January 18, 2012, with the exception of MW-7, <br /> Stantec observed WDC Exploration and Wells of Zamora, California (WDC) properly destroy the <br /> well network associated with the site. <br /> Remediation Status <br /> There is no active remediation present at the site. <br /> Characterization Status <br /> Petroleum hydrocarbon impact in the soil and groundwater has been adequately delineated by <br /> the existing well network and previous site assessment activities. <br /> Waste Disposal Summary <br /> Ninety-two drums containing soil and destruction debris were produced during well construction <br /> activities. The drums are being temporarily stored onsite pending characterization and will be <br /> removed from the site by Belshire Environmental Services Inc. and transported to an approved <br /> facility for disposal_ Waste manifest documentation will be submitted under separate cover. <br /> Recent Correspondence <br /> In a correspondence dated October 19, 2011, the SJCEHD issued a No Further Action directive <br /> pending the destruction of the well network associated with the site. <br /> This Quarter's Activities (Fourth— 2091) <br /> 1. Stantec submitted the QMR - 3Q11 on October 31, 2011. <br /> 2. Stantec submitted Well Destruction Work Plan on October 31, 2011. <br /> 3. In a correspondence dated November 10, 2011, the SJCEHD conditionally approved <br /> Stantec's Well Destruction Work Plan. <br /> 4. On December 12, 2011, Stantec, SJCEHD, and WDC conducted a site visit to <br /> determine the safest method of destruction of each well. In an email <br /> correspondence later that same day, SJCEHD approved Stantec's proposed <br /> methods of well destruction discussed earlier that day. <br /> 5. Between the dates of December 5, 2011 and January 18, 2012, with the exception of <br /> MW-7, Stantec observed WDC properly destroy the well network associated with the <br /> site. Once an encroachment permit is obtained for MW-7, the well will be also be <br /> properly destroyed. <br /> 11193 QSSR 4Q11.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.