Laserfiche WebLink
Working To Restore Nature <br /> SITE SAFETY PLAN No. 17051,01 <br /> SOIL BORING AND <br /> MONITOR WELL INSTALLATION <br /> at <br /> BP Oil Facility-No. 11193. <br /> Kelly'Drive&Hammer Lane <br /> Stockton,California <br /> October,14,1992 <br /> -INTRODUCTION. <br /> 'This Site Safety -Plan describes.basic-safety requirements for the subsurface environmental <br /> investigation. The.provisions:set forth in this Plan apply to the emplo =ntractors. <br /> of RESNA Industries <br /> Inc .and its subcontractors working on this phase of the project. The may elect to <br /> modify these.provisions,but only to upgrade or.increase:the safety requirements, and only with the <br /> concurrence-of RESNA as designated and accepted in writing. <br /> This Site Safety Plan will address the.expected potential hazards that may be encountered on-the <br /> worksite for this project. Field activities are planned to begin in November and the duration will be <br /> approximately one.month:- If changes'in site or workingconditions occur as activities progress, <br /> addenda to this:plan will be provided by RESNA. <br /> AUTHORITY FOR SITE SAFETY <br /> The RESNA personnel responsible for project:safety are the Project Manager and the on-site Staff <br /> ..Geologist or Engineer. The:Hearth and.Safety Coordinator is responsible for the overall RESNA <br /> Health and Safety Program and may choose,ta audit the'site for compliance and take appropriate <br /> action to correct deficiencies. The Project Manager is responsible,for-implementing the provisions <br /> of this Plan, for providing a.copy of this Plan to-the Staff Geologist or Engineer; and for,advising <br /> the .Staff Geologist or.Engineer on-health and safety-matters. The'Project Manager and Staff. <br /> Geologist or Engineer have the'.authority.to audit site activities for-compliance with the provisions <br /> of this Plan. They may.suspend or modify work.:practices or dismiss subcontractors whose <br /> conduct does not meet the requirements specified;n this Plan. <br /> The Staff Geologist or Engineer is responsible for communicating the information contained in.this <br /> Plan to the RESNA.personnel assigned to-the project and to the responsible representative of each <br /> subcontractor working for RESNA-on the.project. <br />