My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety Plan-'October 14, 1992 Working To Restore Nature <br /> BP Oil Facility No.11193,.Stockton, CA <br /> The Staff.Geologist or,Engineer.will also,act .as the Site .Safety Officer. As such, the Staff <br /> Geologist or Engineer'is responsible for addressing the following items: <br /> • Implementing the Site-Safety Plan,Company policy,and procedures <br /> • Requiring and maintaining adequate safety supplies and equipment inventory onsite <br /> •. Conducting daily safetyr meetings and advising workers regarding hazards <br /> t <br /> • Site control,decontamination,-and contamination-'reduction procedures <br /> • Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority,to suspend work anytime he or she finds that the <br /> provisions of the Plan are inadequate for-worker safety. The-Staff Geologist or.Engineer will <br /> inform the Project Manager and the'Health and Safety.`Coordinator promptly of deficiencies within <br /> the Plan or individuals or subcontractors whose conduct is not-consistent with'the requirements of <br /> this Plan. <br /> MEDICALSURVEILLANCE <br /> RESNA.personnel and subcontractors engaged in,project activities must participate in a medical <br /> surveillance program and.'inust be cleared by-the-examining,physician{s}'to_wear respiratory <br /> protection devices and protective,clothing:for working with hazardous-materials The applicable <br /> requirements-of Title'8, Section 521$, of.the C rnia Administrative Code will be :observed. <br /> The applicable requirements under 29 CFR 1910:.120 of the Federal Administrative Code will also <br /> be observed. <br /> .SAFETY AND ORIENTATION MEETING <br /> Field personnel fromRESNA and its subcontractors_willattend a project-specific training meeting <br /> for safety issues and review the project tasks before beginning work. T_he.meeting will be led-by <br /> the Project Manager or.Staff Geologist or Engineer.- In,addition, fit-testing of respiratory <br /> protective devices.will be conducted as part sof the safety orientation.meeting when the use of a <br /> respirator may be required. <br /> 1705.1.01 SSP 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.