Laserfiche WebLink
76(Former BP)Service Station Nij ]193 : . <br /> SJCEHD <br /> !November 15, 2007 <br /> Page 4 <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in SECOR's.contract and <br /> with generally accepted professional engineering and environmental consulting practices existing at <br /> the time this report was prepared and applicable to the location of the site. It was prepared for the <br /> exclusive use of COP, and Atlantic Richfield Company, (a BP affiliated company)for the express <br /> purpose stated above. `Any re-use of this report for a cdifferent purpose or by others not identified <br /> above shall be at the user's sole risk without liability to SECOR. To the extent that this report is <br /> based on information provided to SECOR by third parties, SECOR may have made efforts to verify <br /> this third party information, but SECOR cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other.warranties, expressed or implied are made by <br /> SECOR. <br /> Prepared by: <br /> CA <br /> Cohn O'Donnell <br /> Project Geologist <br /> All information, conclusions, and recommendations provided by SECOR in this document regarding <br /> the site at 3202 West Hammer Lane, Stockton, California has been prepared under the supervision <br /> of and reviewed by the Licensed professional whose signature appears below. <br /> pry C� <br /> Licensed Approver: g5 <br /> 0 Is0 <br /> 0 N <br /> No. 8240 o .i <br /> Brad Shelton, P.G: OS <br /> Project Manager AFoP c�lL�Fo¢ <br /> Date: November 15, 2007 . <br /> i <br /> f <br />�. 1ABP-ARC0105 BP-COP Sites1111931Work Plans111193 MW-12 Well Destruction WP.doc <br /> k <br /> 4 <br />