Laserfiche WebLink
76(Former BP)Service Station N ~ '193 <br /> SJCEHD <br /> November 15,2007 <br /> Page 5 <br /> Attachments: Figure 1 —Site,Plan with Proposed Monitoring Well Locations <br /> Attachment A— Regulatory Correspondence <br /> Attachment B-- Field and Laboratory Procedures <br /> cc: Ms. Shelby Lathrop, ConocoPhillips (Electronic Upload into Livelink) <br /> Mr. Sergio Morescalchi, Atlantic Richfield Company(a BP affiliated company) (Electronic <br /> Upload into Enfos) <br /> 4 4 <br /> I <br /> i <br /> I <br /> Il <br /> I <br /> I:1BP-ARC0105 BP-COP Sites1111931Work Plans111193 MW-12 Well Destruction WP.doc <br />