Laserfiche WebLink
i <br /> SECOR . <br /> 76(Former BP)Service Station_No. 11193 <br /> SJCEHD <br /> August 30,2007 <br /> Page 4 <br /> characterization and disposal. The drums containing soil and rinsatelpurge water <br /> will be removed by a licensed contractor, and transported to their facility for <br /> recycling/.disposal. <br /> • Report. Following the completion of well installation activities, SECOR.will <br /> submit a report documenting the findings. The report will include boring logs and <br /> well construction details, soil and groundwater analytical results, certified <br /> laboratory analytical reports and chain-of-custody documentation, conclusions, <br /> and recommendations for future work if deemed-necessary. <br /> SCHEDULE . <br /> Upon approval of this work plan, SECOR is prepared to initiate investigation.activities with field work <br /> beginning approximately three to four weeks after the applicable permits-and access agreements are <br /> received. A report documenting the results of this assessment will.be'submitted to the SJCEHD <br /> within_six-to,eightweeks following the completion of field work, and the receipt of laboratory <br /> analytical results. <br /> h <br /> I:IBP-ARC0105 BP-COP SRes1111931Work Plans111193 Vertical Delineation WP.doc <br />