Laserfiche WebLink
S E C 0 R <br /> 76(Former 8P)Service Station No. 11193 <br /> SJCEHD <br /> August 30,2007 <br /> Page 3 <br /> Each well will be completed such that the potentiometric surface penetrates the <br /> screened interval. The borehole for well MW-13 will be completed as a two-inch <br /> diameter, Schedule 80 PVC groundwater monitoring well. The depth of the well <br /> and the length of the 0.010-inch slotted screen interval will be determined based <br /> on the depth of the next encountered water-bearing zone consisting of coarse- <br /> grained sediments. For wells greater than 50 feet deep, stainless steel, collar- <br /> type centralizers will be attached to the well casing string,just above thetop of the M <br /> well screen and at every 50 feet of blank casing. In addition, straightness of the <br /> well casing string will be maintained by suspending the casing throughout the well b( <br /> construction process until the annular seal has set. <br /> • Monitoring Well DevelopmentfSampling/Analysis. The newly installed <br /> groundwater monitoring wells will be developed by rigorously surging the wells <br /> over the length of the screen interval, and by purging approximately 10 casing <br /> volumes of water. Unless recharge takes more than two hours,wells are sampled <br /> once the well is recharged to within 80 percent of the pre-purge groundwater <br /> elevation. For very slow recharging wells (wells pumped dry during purging), <br /> samples may be collected after two hours of recharge. Groundwater samples will <br /> be collected and analyzed for the presence of total petroleum hydrocarbons as <br /> gasoline(TPHg), diesel range organics(DRO)with and without silica gel cleanup - <br /> (SGCU) benzene, toluene, ethylbenzene, and xylenes (BTEX), fuel oxygenates <br /> (methyl tert-butyl ether[MtBE], di-isopropyl ether[DIPS],tertiary amyl methyl ether F <br /> [TAME], ethyl tertiary butyl ether[EtBE], tertiary butyl alcohol[TBA]and ethanol), <br /> and lead scavengers (1,2-dichloroethane [1,2-DCA] and 1,2-dibromoethane <br /> [EDB]) by EPA Method 8260B. r. <br /> i <br /> • Well Surveying. Following installation,the newly installed groundwater wells will 1 <br /> be surveyed by a licensed surveyor to a local benchmark relative to mean sea <br /> level. Survey data including elevation, longitude, and latitude will be included in <br /> information uploaded to the State Water Resources Control Board (SWRCB) <br /> Geotracker Database (www.swrcb.neotracker.ca.aov) in accordance with <br /> Assembly Bill (AB) 2886 requirements. <br /> • Compliance with AB 2886 Requirements. Also per AB 2886 requirements, <br /> SECOR will electronically upload the data obtained during this investigation into <br /> the SWRCB Geotracker Database (www.swrcb.geotracker.ca.�ov). <br /> Documentation of the electronic data format(EDF)submittals will be included in <br /> the final report. <br /> • Soil and Water Disposal. Soil cuttings and purgelrinsate water generated during <br /> well installation activities will temporarily be stored in California Department of I <br /> Transportation (DOT)-approved, 55-gallon steel drums on-site pending ; <br /> 4 <br /> 1:113P-ARC0105 BP-COP Sites1111931Work Plans111193 Vertical Delineation WP.doc <br /> I <br />