Laserfiche WebLink
S E C 0 R <br /> Ms. Vicky McCartney <br /> September 15, 2003 <br /> Page 9 <br /> Attachments: Table 1 —Summary of Interim Groundwater Batch Extraction Activities <br /> Table 2—Historical Hydraulic Gradient Data <br /> Table 3—Groundwater Elevation and Analytical Data <br /> Table 4—Fuel Oxygenates Analytical Data <br /> Figure 1 —Site Location Map <br /> Figure 2 —Site Plan With Proposed Well Locations <br /> Figure 3 —TPHg, Benzene, and MtBE Concentrations During Interim Groundwater <br /> Batch Extraction, Well MW-1 R <br /> Figure 4 —TPHg, Benzene, and MtBE Concentrations During Interim Groundwater <br /> Batch Extraction, Well MW-2R <br /> Figure 5 —TPHg, Benzene, and MtBE Concentrations During Interim Groundwater <br /> Batch Extraction, Well VW-1 <br /> Figure 6 —TPHg, Benzene, and MtBE Concentrations During Interim Groundwater <br /> Batch Extraction, Well MW-6 <br /> Figure 7 — Proposed OS System Layout <br /> Attachment 1 — Field and Laboratory Procedures <br /> cc: Ms. Liz Sewell, ConocoPhillips <br /> Mr. Paul Supple, BP <br /> Mr. Marty Hartzell, Central Valley Regional Water Quality Control Board <br /> I:1ConocoPhi11ips\Tosco Marketing1111931Reports\Revised IRAP&WP.doc <br />