Laserfiche WebLink
Work Plan For Soil Sampling Following Product Piping Removal - Tosco (76) #11193 <br /> August 21, 1998 <br /> Task 3. Disposal of Excavated Soil <br /> Stockpiled soil will be removed from the site and disposed of at the Forward landfill in Manteca, <br /> CA. Samples from the stockpiled soil will be collected and analyzed in accordance with <br /> Forward's requirements. We anticipate that it will take a maximum of 2 weeks to receive <br /> analytical results, profile the stockpile for landfill acceptance, and arrange for transportation to <br /> haul the stockpiles to the landfill. <br /> Task 4. Reporting and Office Operations <br /> Upon completion of all environmental activities and receipt of all data, GR will prepare a report <br /> documenting the sampling activities and analytical results. This report will be prepared for <br /> Tosco's use and distribution. <br /> PROJECT STAFF <br /> Mr. Stephen J. Carter, a Registered Geologist in the State of California (R.G. No. 5577), will <br /> provide technical oversight and review of the work. Mr. Douglas J. Lee, Project Manager, will <br /> supervise implementation of field and office operations. GR employs a staff of geologists, engineers, <br /> and technicians who will assist with the project. <br /> If you have questions, please call us in Sacramento at (916) 631-1300. <br /> Sincerely, S��FtED GFO4O <br /> Gettler-Ryan Inc. r\h N J,Cq9�, -A <br /> h <br /> Stephen J. Carter <br /> * No.5577 <br /> Senior Geologist tpr �Q <br /> R.G. 5577 <br /> OFC <br /> Gr Gurss <br /> Senior Project Manager <br /> Attachments: Figure 1. Site Location Map <br /> Figure 2. Site Map <br /> GR Field Methods and Procedures <br /> TO I193.WPI 3 <br />