My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 4:42:26 PM
Creation date
1/30/2020 3:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan For Soil Sampling Following Product Piping Removal - Tosco (76) #11193 <br /> August 21, 1998 <br /> Task 3. Disposal of Excavated Soil <br /> Stockpiled soil will be removed from the site and disposed of at the Forward landfill in Manteca, <br /> CA. Samples from the stockpiled soil will be collected and analyzed in accordance with <br /> Forward's requirements. We anticipate that it will take a maximum of 2 weeks to receive <br /> analytical results, profile the stockpile for landfill acceptance, and arrange for transportation to <br /> haul the stockpiles to the landfill. <br /> Task 4. Reporting and Office Operations <br /> Upon completion of all environmental activities and receipt of all data, GR will prepare a report <br /> documenting the sampling activities and analytical results. This report will be prepared for <br /> Tosco's use and distribution. <br /> PROJECT STAFF <br /> Mr. Stephen J. Carter, a Registered Geologist in the State of California (R.G. No. 5577), will <br /> provide technical oversight and review of the work. Mr. Douglas J. Lee, Project Manager, will <br /> supervise implementation of field and office operations. GR employs a staff of geologists, engineers, <br /> and technicians who will assist with the project. <br /> If you have questions, please call us in Sacramento at (916) 631-1300. <br /> Sincerely, S��FtED GFO4O <br /> Gettler-Ryan Inc. r\h N J,Cq9�, -A <br /> h <br /> Stephen J. Carter <br /> * No.5577 <br /> Senior Geologist tpr �Q <br /> R.G. 5577 <br /> OFC <br /> Gr Gurss <br /> Senior Project Manager <br /> Attachments: Figure 1. Site Location Map <br /> Figure 2. Site Map <br /> GR Field Methods and Procedures <br /> TO I193.WPI 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.