Laserfiche WebLink
I ' IT <br /> T s <br /> Work Plan'For Soil Sampling Following Pioduct Piping Removal Tosco (76) 1111193 <br /> sa August 21;'1998 ° e ` ,. ` '' c <br /> v <br /> , <br /> SiG y "n r <br /> 1� <br /> SCOPE'OF WORK' °+ <br /> * GR will collect the required compliance'samples beneath the product-,pip'ing and dispenser islands <br /> 'Groundwater is norltkely to'be encountered in the initial trench excavations°;'I -.1 mpacted soil,is i <br /> l encountered and Tosco elects-to excavate the impacted soil; GR will observe the over-excavation L' <br /> x <br /> activities;and collect.confirming soil saniples from'the pit-,To unplement this.scope of work, GR TM <br /> ` proposes'the.follow'iiig tasks:. <br /> E 4 Task i 'Compliance Sampling <br /> 1 <br /> * Product piping will be removed by Tosco s contractor =The backfill will be:iemoved'from the f <br /> <,piping trench'.and stockpiled 'SoiLsamples will.be collected from"'the native„soil beneath the <br /> > product.piping on the basis'of one soil sample per 20 lineal feetof piping ,Soil 'samples will be a�g <br /> k, ;.” screened in the field for the preseace'of volatile organic vapors using a photoiomzation detector. `, , <br /> GR sample.collectionand_'bandling procedure's,are described m Appendix A.,4f groundwater is <br /> s "4 encountered in the trench excavations; a grab'groundwatersample will be collected. Soil samples :. <br /> i will'be collected from the.sidewalls of the trenches as r'egmred by;SJCPHS,guidelines.':¢ <br /> Excavated backfill material,will be stockpiled at the.'site pending dis;posa( The stockpile,will be <br /> r placed on and covered with plasticsheetmg: ,Four discrete samples will be,collected;from [he <br /> d stockpile and submitted to the laboratory4or composithig and analysts as;one sample This <br /> composite sample will be analyzed "for TPHg .'BTEX ,MTBE and lead as-,required for disposal <br /> J at the.Forward landfill.,in Manteca;,CA ; <br /> i Y <br /> Compliance-soil samples mill be analyzed at :Sequoia Analytical a State certified Hazardous <br /> Materials Testing taboFatory (EI,AE#1210,#I1 7,1 and#1624) Soil samples from beneath the ':_ <br /> s n' product lines-will be analyzed for-Total Petroleum'`Hydrocarbons 1.as gasoline (TPHg)'.by EPA r', <br /> Method 801'5/DHS L'UET for benzene toluene;'ethyllienzene and total xylenes.(BTEX)by EPA., <br /> Method 8020 "'total lead by. EPA 1vleihod 6010; and the fuel oxygenates methyl tert-butyl ether <br /> i (MTBE) -tert-butyl alcohol, (TBA);di-isopropyl ether(DIPE) ethyl.tert butyl ether(ETBE), and s <br /> tert amyl methyi ether (TAME) by EPA Method 8260 <br /> . a � <br /> Task 2 Over Excavation of•Impacterl Sorl <br />}ta If,either subJective tleld evidence oiJanalytical data in soil beneath the site has'been , <br /> impacted by Uy"drocarbons Tosco imay elect to;excavate the impacted soil GR-wi observe the <br /> . .a x <br /> ' excavation aetivifiess Confirmation soilsamples will be collected f#om the base and lateral limits J <br /> of.the excavation'and analyses performed in accordancemith SJCPHS guidelines If groundwater r <br /> is.encountered,during overexcavation'activities; a grab;groundwatec sample will.be'collected in t ,a <br /> addition to the soil samples;collected from the trench sidewalls`above groundwater We do not <br /> ? +' 'ant,icipate that excavation will continue' eeperihan groundwater Arid therefore do notanticipate' <br /> the.need to pufnp wker from the excavation.- Soil edmoved.during,overexcava ion activities will ? <br /> i be stockpiled at�the sue lir the manner described above pending disposal <br /> z "x '� E x * r' Y ter':• n >r";. �'t ' - <br /> ' <br /> Y <br /> > i ?, -T011193 W Pl ' v rw 3a4': a 2 !. ` ,i`*- .t t 4 y n; <br /> 4 � y <br /> ` s r$k p, w.,dti L a add i fa r <br /> 4' h <br /> �T41, <br /> V <br /> F <br /> v <br />