My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002940
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:27:09 PM
Creation date
1/30/2020 4:19:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002940
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C ® R <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> • 916 861 0400 FAX <br /> 916 861 0430 FAX <br /> Downgradient well MW-6 has consistently contained detectable TPI-Ig and/or MtBE since this well <br /> was installed in 1994 <br /> WASTE DISPOSAL <br /> The volume of purged groundwater generated and disposed of during the quarterly groundwater <br /> monitoring event is documented in SECOR's quarterly groundwater monitoring report <br /> (Attachment 1) <br /> RECENT SUBMITTALS/CORRSPONDENCE <br /> June 1, 2004 — Letter from San Joaquin County Environmental Health Department <br /> (SJEHD) approved the scope of work described in the Addendum to the Revised Remedial <br /> Action Work Plan and Work Plan for Ozone Sparge Well Installation and Additional Off-Site <br /> Assessment <br /> August 13, 2004 — SECOR submitted Ozone Sparge Well Installation and System Startup <br /> Report to SJEHD <br /> September 22, 2004—SECOR submitted CPT Vertical Site Assessment Report to SJEHD <br /> THIS QUARTER ACTIVITIES (Third Quarter 2004) <br /> 1 SECOR performed groundwater monitoring and sampling event <br /> • 2 Completed CPT vertical site assessment and submitted vertical site assessment report <br /> 3 Submitted remedial well Installation report <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2004) <br /> 1 Perform groundwater monitoring and sampling event <br /> 2 Continue System O&M <br /> CONSULTANT SECOR International Incorporated <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.